Excavation Permit Utility Installation Permit No. 2024-EP354, UID # 7325
App. Status: Approved
City of Maple Grove
Engineering Department
12800 Arbor Lakes Parkway
Maple Grove, MN 55369

Kelly Matzke (612-968-3615)
 

APPLICANT

Applicant:
Name:
Brett Christiansen
Company:
Arvig Enterprises Inc
Company Phone:Local Phone:
(218346 - 8138
(218346 - 5500
Email Address:
brett.christiansen@arvig.com
Mailing Address:
160 2nd St SW
Perham MN 56573
Additional email address to notify: monica.braun@trustcompass.com

CONTRACTOR

Contractor:
Name:
Toby Sunderland
Company:
AEI Construction
Company Phone:Local Phone:
(612346 - 3895
(218346 - 5500
Email Address:
toby.sunderland@arvig.com
Mailing Address:
5130 Winnetka Ave N
New Hope MN 55428

PROJECT

Nature of Work:
Main Installation
Service Installation
Surface to be disturbed:
Bituminous*
Work to start on or after: 04/01/2025
To be completed on or before: 07/31/2025
Applicant Project No.: 118001

INSTALLATION / CONSTRUCTION

Provide a detailed work description:
Construction of fiber optic cable via directional bore
Attach detailed plan sheet:
Size and kind of pipe:
(2) 1.25" HDPE
Depth from surface: 36"- 48"
If other is selected, please provide additional information: 60" Under Road Beds
Length of utility construction in feet: 3427
Method of installation:
Note: Beginning July 1, 2025, all installations of underground telecommunications infrastructure must be performed by safety-qualified underground telecommunications installers that meet requirements per MN State Statute 326B.198.
Directional Bore
Other
If other is selected, please provide additional information:
possible pot holing
Development: New
Attach letter/door hanger used to notify property owners affected by construction:

LOCATION

Location/Address: 6125 Maple Grove Parkway Plymouth, MN
Mark the location of the installation
How to use:
1. Use only one option (dot, line, or polygon)
2. Made a mistake? Click on feature and press delete key.

TRAFFIC CONTROL

Proposed work that impacts vehicle and/or pedestrian traffic will require a traffic control plan. Will traffic control be necessary? Yes

TRAFFIC CONTROL PLAN

Invoice #6828 (09/23/2024)

Charge Cost Quantity Total
Non-Taxable
added 09/23/2024 12:42 PM

Excavation permit fee per occurance

$160.00 x 1 $160.00
added 09/23/2024 12:42 PM

In addition to excavation permit fee (per lineal foot)

$0.20 x 3,327 $665.40
Grand Total
Total $825.40
Payment 09/23/2024$825.40
Due$0.00
Action: Print  

SPECIAL PROVISIONS

It is understood that the work and/or staging area along Maple Grove Parkway will not encroach into the vehicular travel lane. If it does, the applicant must resubmit a revised traffic control plan for review and approval.

It is also understood that the proposed pedestrian flagger control will minimize delays to pedestrians while safely traveling through the work area, and crossing the side streets.

Approvals

ApprovalSignatureOptions
ApplicantBrett Christiansen - 10/18/2024 1:15 PM
e35880cd97c1f3b24221879d0a1ed618
4dab18ca2f377c1fa0776b53905f6058
 
#1 Right of Way Technician ApprovalKelly Matzke - 10/21/2024 1:48 PM
bf361196867434112bedb117a670f3ee
d844f1e5553881304c2983bd0755f7c9
 
#2 Traffic Operations Engineer ApprovalJohn Hagen - 10/21/2024 1:48 PM
ff17bb76aa39606939627ab84448ad9b
a4e688307121350b787021f18248dcaf
 
Application has been approved. All signatures have been obtained.
Text:
File(s):
    Text:
    File(s):
      Powered by