City of Maple Grove
Excavation Permit Utility Installation Permit No. 2023-EP168, UID # 6206
App. Status: ApprovedCity of Maple Grove
Engineering Department
12800 Arbor Lakes Parkway
Maple Grove, MN 55369
Kelly Matzke (612-968-3615)
App. Status: ApprovedCity of Maple Grove
Engineering Department
12800 Arbor Lakes Parkway
Maple Grove, MN 55369
Kelly Matzke (612-968-3615)
APPLICANT
Applicant: |
|
||||||||||||||||||||||||||||||||||||||||
Additional email address to notify: | patrick.edmonds-tlr@consulttlr.us |
CONTRACTOR
Contractor: |
|
PROJECT
Nature of Work: | Other |
Surface to be disturbed: | Boulevard |
Work to start on or after: | 07/12/2023 |
To be completed on or before: | 08/10/2023 |
Applicant Project No.: | 21112023E - JB1337550 |
INSTALLATION / CONSTRUCTION
Provide a detailed work description: | Contractor to set new node pedestal and handhole next to existing power supply. Once completed, contractor to change out existing equipment at locations shown in red on attached map. |
Attach detailed plan sheet: | |
Size and kind of pipe: | 2" hdpe |
Depth from surface: | Other, I will describe below |
If other is selected, please provide additional information: | 18" |
Length of utility construction: | 5 |
Method of installation: | Hand Dig Open Trench |
Development: | Existing |
LOCATION
Location/Address: | 15525 73rd Pl. N. |
Mark the location of the installation How to use: 1. Use only one option (dot, line, or polygon) 2. Made a mistake? Click on feature and press delete key. |
TRAFFIC CONTROL
Will traffic control be necessary? | Yes |
TRAFFIC CONTROL PLAN
Attach Traffic Control Plan: |
|
Invoice #5706 (05/23/2023)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 05/23/2023 11:18 AM Excavation permit fee per occurance |
$160.00 | x 1 | $160.00 |
added 05/23/2023 11:18 AM Add obstruction fee if applicable to project. |
$50.00 | x 1 | $50.00 |
Grand Total | |||
Total | $210.00 | ||
Payment 05/23/2023 | $210.00 | ||
Due | $0.00 |
Action: Print
SPECIAL PROVISIONS
It is assumed that the proposed work will not impact travel lanes and/or shoulders and that staging will not impact pedestrian traffic along the existing sidewalks/trails on 73rd Place. If the proposed work will impact either of these two items, a revised traffic control plan will need to be submitted and approved.
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Ben Elsenpeter - 05/23/2023 11:19 AM 8cabf06f60d39d9f7be097bea656281d 67849569788615598b340422f71a3d44 | |
#1 Right of Way Technician Approval | Kelly Matzke - 05/26/2023 11:26 AM 02b13bc4e2db780ef646252cf05e273c e001477a38181a888475ec7b758e8320 | |
#2 Traffic Operations Engineer Approval | John Hagen - 05/26/2023 11:26 AM afeb39957713a18cd3ee5de145e336fc 512c8b078688d78750eb96192f96b054 |
Application has been approved. All signatures have been obtained.
Text: | |
File(s): |
Text: | |
File(s): |