Excavation Permit Utility Installation Permit No. 2023-EP168, UID # 6206
App. Status: Approved
City of Maple Grove
Engineering Department
12800 Arbor Lakes Parkway
Maple Grove, MN 55369

Kelly Matzke (612-968-3615)
 

APPLICANT

Applicant:
Name:
patrick edmonds
Company:
TLR Consulting
Company Phone:Local Phone:
(320963 - 2845
(320963 - 2845
Email Address:
patrick.edmonds-tlr@consulttlr.us
Mailing Address:
9938 state hwy. 55 nw.
annandale mn 55302
Additional email address to notify: patrick.edmonds-tlr@consulttlr.us

CONTRACTOR

Contractor:
Name:
jessub pearson
Company:
MP Nexlevel
Company Phone:Local Phone:
(320963 - 2400
(612499 - 4436
Email Address:
jessub.pearson@mpnexlevel.us
Mailing Address:
500 co. rd. 37 e.
maple lake mn 55358

PROJECT

Nature of Work:
Other
Surface to be disturbed:
Boulevard
Work to start on or after: 07/12/2023
To be completed on or before: 08/10/2023
Applicant Project No.: 21112023E - JB1337550

INSTALLATION / CONSTRUCTION

Provide a detailed work description:
Contractor to set new node pedestal and handhole next to existing power supply. Once completed, contractor to change out existing equipment at locations shown in red on attached map.
Attach detailed plan sheet:
Size and kind of pipe:
2" hdpe
Depth from surface: Other, I will describe below
If other is selected, please provide additional information: 18"
Length of utility construction: 5
Method of installation:
Hand Dig
Open Trench
Development: Existing

LOCATION

Location/Address: 15525 73rd Pl. N.
Mark the location of the installation
How to use:
1. Use only one option (dot, line, or polygon)
2. Made a mistake? Click on feature and press delete key.

TRAFFIC CONTROL

Will traffic control be necessary? Yes

TRAFFIC CONTROL PLAN

Attach Traffic Control Plan:

Invoice #5706 (05/23/2023)

Charge Cost Quantity Total
Non-Taxable
added 05/23/2023 11:18 AM

Excavation permit fee per occurance

$160.00 x 1 $160.00
added 05/23/2023 11:18 AM

Add obstruction fee if applicable to project.

$50.00 x 1 $50.00
Grand Total
Total $210.00
Payment 05/23/2023$210.00
Due$0.00

SPECIAL PROVISIONS

It is assumed that the proposed work will not impact travel lanes and/or shoulders and that staging will not impact pedestrian traffic along the existing sidewalks/trails on 73rd Place. If the proposed work will impact either of these two items, a revised traffic control plan will need to be submitted and approved.

Approvals

ApprovalSignature
ApplicantBen Elsenpeter - 05/23/2023 11:19 AM
8cabf06f60d39d9f7be097bea656281d
67849569788615598b340422f71a3d44
#1 Right of Way Technician ApprovalKelly Matzke - 05/26/2023 11:26 AM
02b13bc4e2db780ef646252cf05e273c
e001477a38181a888475ec7b758e8320
#2 Traffic Operations Engineer ApprovalJohn Hagen - 05/26/2023 11:26 AM
afeb39957713a18cd3ee5de145e336fc
512c8b078688d78750eb96192f96b054
Application has been approved. All signatures have been obtained.

Public Notes

Text:
File(s):

    Internal Notes

    Text:
    File(s):
      Powered by