City of Maple Grove
App. Status: Work CompletedCity of Maple Grove
Engineering Department
12800 Arbor Lakes Parkway
Maple Grove, MN 55369
Kelly Matzke (612-968-3615)
APPLICANT
Applicant: |
|
CONTRACTOR
Contractor: |
|
OBSTRUCTION
Reason for obstruction: | Access for splicing at existing HH3-HH3 and Ped-Unk at the intersection Elm Creek Blvd / CR130 and Hemlock Lane / CR130. Work truck with 360 degree light will be parked more than 2 feet from the curb on the boulevard that has a detour to pedestrian traffic. Access for splicing at existing HH 1233-HH1 at the intersection Elm Creek Blvd / CR130 and Hemlock Lane / CR130. Work truck with 360 degree light will be parked more than 2 feet from the curb on the boulevard that has a detour to pedestrian traffic. Access for splicing at existing HH 1233-HH28 at 11905 Elm Creek Blvd. Work truck with 360 degree light will be parked more than 2 feet from the curb on the boulevard that has a detour to pedestrian traffic |
Right-of-Way being obstructed: | Boulevard |
Attach detailed plan sheet: |
|
Obstruction to start on or after: | 09/02/2021 |
Obstruction to be completed on or before: | 03/02/2022 |
Applicant Project No.: | N.903009 |
LOCATION
Location/Address: | the intersection Elm Creek Blvd / CR130 and Hemlock Lane / CR130 |
Mark the location of the obstruction: |
TRAFFIC CONTROL
Will traffic control be necessary? | Yes |
TRAFFIC CONTROL PLAN
Attach Traffic Control Plan: |
|
Terms
Contact Kelly Matzke at (612) 968-3615 at least 24 hours prior to obstruction to activate permit. Failure to contact Mr. Matzke to activate permit prior to work being started shall be considered a violation of the permit and grounds for dismissing contractor from the job site.
Article IV. Public Right-of-Way Management Ordinance will be enforced obstruction in the right-of-way.
All properties affected by the obstruction must be notified in writing prior to beginning work.
Any work involving excavation, such as but not limited to digging, boring, or physically disturbing the right-of-way, will require an Excavation Permit instead of an Obstruction Permit.
Obstruction taking place in the Maple Grove city limits in the Hennepin County right-of-way requires permits from the City of Maple Grove and Hennepin County.
The permit issued does not in any way imply an easement on private property or grant a right to encroach on private property.
A City of Maple Grove Obstruction Permit shall be on site at all times and available upon request by any City official.
Safety vests must be worn by all people occupying the right-of-way.
Vehicles, equipment, and materials are not allowed on sidewalks, trails, or ped ramps at any time unless the contractor performing work has exhausted all other alternatives, including, but not limited to lane closures, boulevard parking, etc. If it has been determined that all alternatives have been exhausted, permission must be obtained from City representative before proceeding to use sidewalks, trails, or ped ramps.
Any changes or revisions to the Obstruction Permit after approval must be resubmitted and approved before proceeding with obstructing the right-of-way.
Any placement of utilities, including but not limited to cabinets, boxes, and pedestals must conform to City Code.
New ground structures must be placed near existing structures at a minimum of at least five feet away from hydrants.
Inclement weather shall be reason for delay or suspension of obstruction as determined by the City of Maple Grove.
All permit applications requiring traffic control shall conform to the most recent version of the Minnesota Manual on Uniform Traffic Control Devices, including the Temporary Traffic Control Zone Layouts Field Manual, and be approved by the Transporation Operations Engineer.
The City of Maple Grove only allows traffic control to occur during off peak hours, which is between 9:00am-3:00 pm Monday thru Friday.
All traffic control devices must be removed from the job site promptly upon completion of work.
Traffic control on weekends requires prior approval from Transportation Operations Engineer John Hagen. John can be reached via email at jhagen@maplegrovemn.gov or 763-494-6364
Damage on roadways and boulevards due to vehicles or equipment must be restored and treated the same way excavation damage is restored.
All contractors, including subcontractors, must be registered with the City of Maple Grove to do work in the right-of-way. Contractors doing work in the right-of-way that are not registered with the City will be considered in violation, and will be dismissed from the work site until registration is completed.
Invoice #4226 (08/26/2021)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 08/26/2021 6:18 AM Obstruction Permit fee per occurance |
$50.00 | x 1 | $50.00 |
Grand Total | |||
Total | $50.00 | ||
Payment 08/26/2021 | $50.00 | ||
Due | $0.00 |
SPECIAL PROVISIONS
Any proposed work and/or traffic control placed within County right-of-way (along Elm Creek Boulevard, or Hemlock Lane - south of Elm Creek Blvd) will need approval by Hennepin County.
Approvals
Approval | Signature |
---|---|
Applicant | Cindy L. Albright - 08/26/2021 6:18 AM 1ccf02b6da68db2eac95617dd3d1a35e e65ad1b9f3d513f6f597f1d077a2af1b |
#1 Right of Way Technician Approval | Kelly Matzke - 09/07/2021 8:48 AM c2cade6c48afba03edc32a1e8b76d4f8 de0d1e25bf2883f377beb0331e740ddc |
#2 Traffic Operations Engineer Approval | John Hagen - 09/07/2021 12:16 PM e2d9d3de025b8e71c65f8914ec310c73 1acf1329f06eb369ca2e7d815e07464a |
Internal Notes
Text: | |
File(s): |
Public Notes
Text: | |
File(s): |