Excavation Permit Utility Installation Permit No. 2017-001, UID # 467
App. Status: Closed
Valid: 01/16/2017 - 06/30/2017
City of Maple Grove
Engineering Department
12800 Arbor Lakes Parkway
Maple Grove, MN 55369

Kelly Matzke (612-968-3615)
 

APPLICANT

Applicant:
Name:
Jody Cox
Company:
CenterPoint Energy
Company Phone:Local Phone:
(612321 - 5532
(612321 - 5532
Email Address:
jodell.cox@centerpointenergy.com
Mailing Address:
700 W Linden Ave
Minneapolis MN 55440

PROJECT

Nature of Work:
Service Installation
Surface to be disturbed:
Boulevard
Work to start on or after: 01/16/2017
To be completed on or before: 06/30/2017
Applicant Project No.: CP80688080

INSTALLATION / CONSTRUCTION

Attach detailed plan sheet:
Size and kind of pipe:
1/2" Plastic
MGC# 17-20
Depth from surface: 36"- 48"
Length of utility construction: 0
Method of installation:
Open Trench
Machine excavation: Yes
Development: Existing

LOCATION

Location/Address: 7752 Peony Ln N - MGC# 17-20
Mark the installation/construction
location on the map:
Mark the location of the installation
How to use:
1. Use only one option (dot, line, or polygon)
2. Made a mistake? Click on feature and press delete key.
Will traffic detouring be necessary? No
Will any excavation be taking place on Hennepin County right-of-way? No

Terms

Requirements
  • Contact the Right-of-Way Technician by phone (612-968-3615) 24 hours prior to starting work, and upon completion so a final inspection can be completed in a timely manner.

  • You must adhere to [url=https://www.revisor.mn.gov/statutes/?id=216D]Minnesota Statutes 2015 CHAPTER 216D. EXCAVATION NOTICE SYSTEM[/url]

  • Notify all affected properties in writing prior to beginning work.

  • All cabinets, boxes, pedestals, etc. at corners must meet the City of Maple Grove's City Code, Sec. 360818 traffic visibility at corner lots.

  • All large trucks or large equipment are not allowed on any boulevard sidewalk or bituminous trails unless prior approval has been granted by the Right-of-Technician.

  • All signing for equipment in street must conform to the current MnDOT Manual on Uniform Traffic Control Devices.

  • Pneuma gophering is not allowed by the City of Maple Grove in this area.

  • All underground utilities must be placed a minimum of 36" and 48" maximum below finished top of curb elevation.

  • No hand holes or pot-holing in bituminous trails unless approved by the Right-of-Way Technician.

  • All disturbed areas must be returned to their original conditions within 30 days.

  • Lawn / Blvd areas must be restored per 28-105 of the Maple Grove Code of Ordinances.

  • Must adhere to MnDOT's Standard Specifications for Construction, Section 2575 and Maple Grove's specification for grading, landscaping and traffic control.

  • Notify Right-of Way Technician when work under this permit is completed, not at year's end.

  • Flag or mark utility location as required by state statue prior to calling in locates.

  • No work shall begin this year if it cannot be properly restored this year (unless emergency).

  • Street crossings to be installed perpendicular to street whenever possible.

Invoice #328 (01/04/2017)

Charge Cost Quantity Total
Grand Total
Total $0.00
Due$0.00
Action: Print  

Approvals

ApprovalSignatureOptions
ApplicantJody Cox - 01/04/2017 7:35 AM
7c68edadfdfc43b5ae9345f1eb2c9eb6
dba367fb91239b99dc04073678940754
 
#1 Approved ByKelly Matzke - 01/06/2017 11:08 AM
610f746d64457fd34021380cc86053df
91f4777f1b004ff1260e916e48f13695
 
Application has been approved. All signatures have been obtained.