Excavation Permit Utility Installation Permit No. 2021-EP054, UID # 4525
App. Status: Work Completed
City of Maple Grove
Engineering Department
12800 Arbor Lakes Parkway
Maple Grove, MN 55369

Kelly Matzke (612-968-3615)
 

APPLICANT

Applicant:
Name:
Kim A Rakotz
Company:
Comcast
Company Phone:Local Phone:
(651269 - 6712
(651493 - 6258
Email Address:
kimberly_rakotz3@comcast.com
Mailing Address:
4255 Lexington Ave
STE 100
Areen Hills MN 55126
Additional email address to notify: ssandkamp@usi-universal.com

CONTRACTOR

Contractor:
Name:
Nick Sarantos
Company:
Universal Services
Company Phone:Local Phone:
(651775 - 1713
(651775 - 1713
Email Address:
nsarantos@usi-universal.com
Mailing Address:
12151 120th St. S
Hastings MN 55033

PROJECT

Nature of Work:
Main Installation
Service Installation
Surface to be disturbed:
Boulevard
Work to start on or after: 04/26/2021
To be completed on or before: 10/26/2021
Applicant Project No.: Comcast JB-598926

INSTALLATION / CONSTRUCTION

Provide a detailed work description:
Underground fiber installation: Pulling fiber through existing conduit. Directional boring for placement of new conduit. Replacing a pedestal.
Attach detailed plan sheet:
Size and kind of pipe:
1.5" HDPE
Depth from surface: 36"- 48"
Length of utility construction: 169
Method of installation:
Directional Bore
Development: Existing

LOCATION

Location/Address: 6705 Wedgwood Ct. N. (via 67th Ave. N)
Mark the location of the installation
How to use:
1. Use only one option (dot, line, or polygon)
2. Made a mistake? Click on feature and press delete key.

TRAFFIC CONTROL

Will traffic control be necessary? Yes

TRAFFIC CONTROL PLAN

Attach Traffic Control Plan:

Terms

ACTIVATION REQUIRED
  • Contact Kelly Matzke at (612) 968-3615 at least 24 hours prior to construction to activate permit. Failure to contact Mr. Matzke to activate permit prior to work being started shall be considered a violation of the permit and grounds for dismissing contractor from the job site.

GENERAL
  • Article IV. Public Right-of-Way Management Ordinance will be enforced for work being done in the right-of-way.

  • All excavations taking place in right-of-way must conform to Minnesota Statute Chapter 216D. Excavation Notice System.

  • All rules and regulations for locates must conform to the most current Gopher State One Handbook.

  • Excavations taking place in the Maple Grove city limits in the Hennepin County right-of-way requires permits from the City of Maple Grove and Hennepin County.

  • Flagging or painting of route required by City of Maple Grove prior to calling in Gopher State One Call ticket.

  • All properties affected by excavation and construction must be notified in writing prior to beginning work.

  • The permit issued does not in any way imply an easement on private property or grant a right to encroach on private property.

  • A City of Maple Grove Excavation Permit shall be on site at all times and available upon request by any City official.

  • Safety vests must be worn by all people occupying the right-of-way.

CONSTRUCTION
  • All underground utilities must be placed a minimum of 36" and 48" maximum below finished top of curb elevation.

  • Any placement of utilities, including but not limited to cabinets, boxes, and pedestals must conform to City Code.

  • New ground structures must be placed near existing structures at a minimum of at least five feet away from hydrants.

  • Absolutely no removal of bituminous or concrete is allowed without prior approval from the City of Maple Grove.

  • Core drilling is not allowed in street, sidewalk, or trail without prior approval from City of Maple Grove. The City of Maple Grove does not allow core drilling to take place in ped ramps.

  • Vehicles, equipment, and materials are not allowed on sidewalks, trails, or ped ramps when seasonal weight restrictions are in effect in Maple Grove. Approval to access areas during other times of the year requires approval from the City of Maple Grove.

  • Any changes or revisions to the Excavation Permit after approval must be resubmitted and approved before proceeding with work in the right-of-way.

  • Street crossings must be installed perpendicular to the road to avoid future potholing in street.

  • Plowing and pneuma gophering are not acceptable forms of excavation allowed in the City of Maple Grove.

  • All open trenches and holes must be backfilled before leaving work site at the end of the day.

  • All flags from locates must be removed and picked up immediately once excavation has been completed.

  • Inclement weather shall be reason for delay of the project start or suspension of the project as determined by the City of Maple Grove.

TRAFFIC CONTROL
  • All permit applications requiring traffic control shall conform to the most recent version of the Minnesota Manual on Uniform Traffic Control Devices, including the Temporary Traffic Control Zone Layouts Field Manual, and be approved by the Transporation Operations Engineer.

  • The City of Maple Grove only allows traffic control to occur during off peak hours, which is between 9:00am-3:00 pm Monday thru Friday.

  • All traffic control devices must be removed from the job site promptly upon completion of work.

  • Traffic control on weekends requires prior approval from Transportation Operations Engineer John Hagen. John can be reached via email at jhagen@maplegrovemn.gov or 763-494-6364.

RESTORATION
  • Restoration must conform to Section 28-105. Restoration of Right-of-Way.

  • Restoration Requirements on Soft Surfaces:

    1. Turf: Hydroseeding is required unless otherwise directed by Right-of-Way Technician.
    2. Soil: Six inches of topsoil is required on all boulevards that are damaged.
    3. Sprinklers: Restore to prior condition with like materials and equipment.
    4. Pet Fences: Check for continuity after repair.
    5. Landscaping: Restore to original with like materials.
  • Removal/Restoration Requirements on Hard Surfaces:

    1. Bituminous: Shall be removed and restored in a timely matter to its original or better condition.
    2. Concrete: Shall be removed and restored in a timely matter to its original or better condition.
    3. Driveways: Notify Right-of-Way Technician of any damage and address with homeowner.
  • Restoration Requirements in areas where core drills were approved:

    1. Bituminous: Core drills in bituminous paths are replaced at width of path (example: 8 foot wide path is replaced 8'x8' per core).
    2. Concrete: Core drills in sidewalks require a minimum of two panels to be replaced per core to assure base has been properly reestablished.
  • All disturbed areas during excavation must be restored to their original condition within 30 days.

  • Damage on boulevards due to vehicles and equipment must be restored and treated the same way that excavation damage is restored.

  • Work completed in winter months must notify City with plans for restoration to take place in the spring.

  • Once restoration has been completed, contact Kelly Matzke at (612) 968-3615 or change status on permit software so an inspection can be completed in a timely manner. Failure to notify the City will result in all permits with the City of Maple Grove being put on hold until notification takes place.

ADDITIONAL INFORMATION
  • All contractors, including subcontractors, must be registered with the City of Maple Grove to do work in the right-of-way. Contractors doing work in the right-of-way that are not registered with the City will be considered in violation, and will be dismissed from the work site until registration is completed.

  • Absolutely no removal of bituminous or concrete is allowed during winter months.

Invoice #4006 (04/09/2021)

Charge Cost Quantity Total
Grand Total
Total $0.00
Due$0.00
Action: Print  

Approvals

ApprovalSignatureOptions
ApplicantKim A. Rakotz - 04/09/2021 4:28 PM
a581797a43b67d3f423d1280be3386c2
41c01cf9ae0cd7919965b9f922bc48e2
 
#1 Right of Way Technician ApprovalKelly Matzke - 04/13/2021 11:34 AM
03c6391300c30569f881a637ad72159a
778b709b706c832395f32d170b9caec6
 
#2 Traffic Operations Engineer ApprovalJohn Hagen - 04/13/2021 12:33 PM
c107ae396cb53748cea7608832275588
1dc8299681cc12eca84845ebe787af06
 
Application has been approved. All signatures have been obtained.
Text:
File(s):
    Text:
    File(s):