Excavation Permit Utility Installation Permit No. 2020-EP284, UID # 4135
App. Status: Work Completed
City of Maple Grove
Engineering Department
12800 Arbor Lakes Parkway
Maple Grove, MN 55369

Kelly Matzke (612-968-3615)
 

APPLICANT

Applicant:
Name:
Kimberly Kay Ignatowicz
Company:
CenterPoint Energy
Company Phone:Local Phone:
(612321 - 5325
(612321 - 5325
Email Address:
kimberly.ignatowicz@centerpointenergy.com
Mailing Address:
700 W Linden Ave
Minneapolis MN 55440

CONTRACTOR

Contractor:
Name:
Kimberly Kay Ignatowicz
Company:
CenterPoint Energy
Company Phone:Local Phone:
(612321 - 5325
(612321 - 5325
Email Address:
kimberly.ignatowicz@centerpointenergy.com
Mailing Address:
700 W Linden Ave
Minneapolis MN 55440

PROJECT

Nature of Work:
Main Installation
Service Installation
Surface to be disturbed:
Boulevard
Work to start on or after: 11/16/2020
To be completed on or before: 08/31/2021
Applicant Project No.: SAP# 95696951

INSTALLATION / CONSTRUCTION

Provide a detailed work description:
MGC# 20-4445 CONTACT MARCIA KOLSTAD 612-321-5482 NATURAL GAS & MAIN INSTALLATION
Attach detailed plan sheet:
Size and kind of pipe:
2" & 4" PLASTIC
Depth from surface: 36"- 48"
Length of utility construction: 1554
Method of installation:
Directional Bore
Development: New

LOCATION

Location/Address: 70 PL N & TROY LN MAPLE GROVE MN
Mark the location of the installation
How to use:
1. Use only one option (dot, line, or polygon)
2. Made a mistake? Click on feature and press delete key.

TRAFFIC CONTROL

Will traffic control be necessary? No

Invoice #3617 (10/14/2020)

Charge Cost Quantity Total
Non-Taxable
added 10/14/2020 12:02 PM

Excavation permit fee per occurance

$160.00 x 1 $160.00
added 10/14/2020 12:02 PM

In addition to excavation permit fee (per lineal foot)

$0.20 x 1,554 $310.80
Grand Total
Total $470.80
Payment 10/14/2020$470.80
Due$0.00
Action: Print  

Approvals

ApprovalSignatureOptions
ApplicantKimberly K. Ignatowicz - 10/14/2020 12:03 PM
d34116ac2537c91de33aea4910231eec
f311d05831d7ff8b012b9eee14853e06
 
#1 Right of Way Technician ApprovalKelly Matzke - 10/20/2020 12:23 PM
c71a1b24801979f838f9cd70a9635140
a01e0b31d379d2c8005dad6659839d8a
 
Application has been approved. All signatures have been obtained.
Text:
File(s):
    Text:
    File(s):