Obstruction Permit Obstruction Permit Permit No. 2020-OP001, UID # 3496
App. Status: Activated
City of Maple Grove
Engineering Department
12800 Arbor Lakes Parkway
Maple Grove, MN 55369

Kelly Matzke (612-968-3615)
 

APPLICANT

Applicant:
Name:
Evan Doran
Company:
Doran Companies
Company Phone:Local Phone:
(952641 - 9475
(952288 - 2000
Email Address:
evan.doran@dorancompanies.com
Mailing Address:
7803 Glenroy Road, Suite 200
Bloomington MN 55439

CONTRACTOR

Contractor:
Name:
Evan Doran
Company:
Doran Companies
Company Phone:Local Phone:
(952288 - 2000
(612270 - 7293
Email Address:
terry.hendrickson@dorancompanies.com
Mailing Address:
7803 Glenroy Road, Suite 200
Bloomington MN 55439

OBSTRUCTION

Reason for obstruction:
Temporary construction trailer for new construction project.
Right-of-Way being obstructed:
Street
Attach detailed plan sheet:
Obstruction to start on or after: 03/09/2020
Obstruction to be completed on or before: 03/09/2022

LOCATION

Location/Address: 11500 Arbor Lakes Parkway N
Mark the location of the obstruction:

TRAFFIC CONTROL

Will traffic control be necessary? No

Terms

ACTIVATION REQUIRED
  • Contact Kelly Matzke at (612) 968-3615 at least 24 hours prior to obstruction to activate permit. Failure to contact Mr. Matzke to activate permit prior to work being started shall be considered a violation of the permit and grounds for dismissing contractor from the job site.

GENERAL
  • Article IV. Public Right-of-Way Management Ordinance will be enforced for obstruction in the right-of-way.

  • All properties affected by the obstruction must be notified in writing prior to beginning work.

  • Any work involving excavation, such as but not limited to digging, boring, or physically disturbing the right-of-way, will require an Excavation Permit instead of an Obstruction Permit.

  • Obstruction taking place in the Maple Grove city limits in the Hennepin County right-of-way requires permits from the City of Maple Grove and Hennepin County.

  • The permit issued does not in any way imply an easement on private property or grant a right to encroach on private property.

  • A City of Maple Grove Obstruction Permit shall be on site at all times and available upon request by any City official.

  • Safety vests must be worn by all people occupying the right-of-way.

CONSTRUCTION
  • Vehicles, equipment, and materials are not allowed on any sidewalk or trail unless prior approval has been granted by a City of Maple Grove official.

  • Any changes or revisions to the Obstruction Permit after approval must be resubmitted and approved before proceeding with obstructing the right-of-way.

  • Inclement weather shall be reason for delay of the project start or suspension of the project as determined by the City of Maple Grove.

  • New ground structures must be placed near existing structures at a minimum of at least five feet away from hydrants.

TRAFFIC CONTROL
  • All permit applications requiring traffic control shall conform to the most recent version of the Minnesota Manual on Uniform Traffic Control Devices Minnesota Manual on Uniform Traffic Control Devices, including the Temporary Traffic Control Zone Layouts Field Manual Temporary Traffic Control Zone Layouts Field Manual, and be approved by the Transporation Operations Engineer.

  • The City of Maple Grove only allows traffic control to occur during off peak hours, which is between 9:00am-3:00 pm Monday thru Friday.

  • Traffic control on weekends requires prior approval from Transportation Operations Engineer John Hagen. John can be reached via email at jhagen@maplegrovemn.gov or 763-494-6364.

RESTORATION
  • New ground structures must be placed near existing structures at a minimum of at least five feet away from hydrants.

  • All disturbed areas during excavation must be restored to their original condition within 30 days.

  • Damage on boulevards due to vehicles and equipment must be restored and treated the same way that excavation damage is restored.

ADDITIONAL INFORMATION
  • All contractors, including subcontractors, must be registered with the City of Maple Grove to do work in the right-of-way. Contractors doing work in the right-of-way that are not registered with the City will be considered in violation, and will be dismissed from the work site until registration is completed.

Invoice #3076 (02/21/2020)

Charge Cost Quantity Total
Non-Taxable
added 02/21/2020 11:54 AM

Obstruction Permit fee per occurance

$50.00 x 1 $50.00
Grand Total
Total $50.00
Payment 02/21/2020$50.00
Due$0.00
Action: Print  

Approvals

ApprovalSignatureOptions
ApplicantEvan Doran - 02/21/2020 11:58 AM
3cd185b7d5fbc31ca695d5e8b5f5ab52
ea77edcfd69be2e65833cabdab013fca
 
#1 Right of Way Technician ApprovalKelly Matzke - 02/25/2020 1:47 PM
b25cf9c27814d6acc7c38fc96166dc31
0a84458ea5c0fc51ee632a997615f82e
 
Application has been approved. All signatures have been obtained.
Text:
File(s):
    Text:
    File(s):
      Powered by