Excavation Permit Utility Installation UID # 328
App. Status: Canceled
Valid: 05/04/2017 - 10/02/2017
City of Maple Grove
Engineering Department
12800 Arbor Lakes Parkway
Maple Grove, MN 55369

Kelly Matzke (612-968-3615)
 

APPLICANT

Applicant:
Name:
Megan Barthel
Company:
Midwest Landscapes, Inc.
Company Phone:Local Phone:
(612470 - 9389
(612470 - 9389
Email Address:
mbarthel@midwestlandscapes.com
Mailing Address:
6221 Oakwood Ave NE
Otsego MN 55330

PROJECT

Nature of Work:
Service Installation
Surface to be disturbed:
Bituminous
Boulevard
Work to start on or after: 05/04/2017
To be completed on or before: 10/02/2017

INSTALLATION / CONSTRUCTION

Attach detailed plan sheet:
Size and kind of pipe:
4"
Depth from surface: Other, I will describe below
If other is selected, please provide additional information: 18-24"
Length of utility construction: 1425
Method of installation:
Other
If other is selected, please provide additional information:
plowing in
Machine excavation: Yes
Development: New

LOCATION

Location/Address: weaver lake road & norwood lane
Will traffic detouring be necessary? No

Terms

Requirements
  • Contact the Right-of-Way Technician by phone (612-968-3615) 24 hours prior to starting work, and upon completion so a final inspection can be completed in a timely manner.

  • You must adhere to [url=https://www.revisor.mn.gov/statutes/?id=216D]Minnesota Statutes 2015 CHAPTER 216D. EXCAVATION NOTICE SYSTEM[/url]

  • Notify all affected properties in writing prior to beginning work.

  • All cabinets, boxes, pedestals, etc. at corners must meet the City of Maple Grove's City Code, Sec. 360818 traffic visibility at corner lots.

  • All large trucks or large equipment are not allowed on any boulevard sidewalk or bituminous trails unless prior approval has been granted by the Right-of-Technician.

  • All signing for equipment in street must conform to the current MnDOT Manual on Uniform Traffic Control Devices.

  • Pneuma gophering is not allowed by the City of Maple Grove in this area.

  • All underground utilities must be placed a minimum of 36" and 48" maximum below finished top of curb elevation.

  • No hand holes or pot-holing in bituminous trails unless approved by the Right-of-Way Technician.

  • All disturbed areas must be returned to their original conditions within 30 days.

  • Lawn / Blvd areas must be restored per 28-105 of the Maple Grove Code of Ordinances.

  • Must adhere to MnDOT's Standard Specifications for Construction, Section 2575 and Maple Grove's specification for grading, landscaping and traffic control.

  • Notify Right-of Way Technician when work under this permit is completed, not at year's end.

  • Flag or mark utility location as required by state statue prior to calling in locates.

  • No work shall begin this year if it cannot be properly restored this year (unless emergency).

  • Street crossings to be installed perpendicular to street whenever possible.

Invoice #245 (10/18/2016)

Charge Cost Quantity Total
Non-Taxable
added 10/18/2016 12:46 PM

Excavation permit fee per occurance

$130.00 x 1 $130.00
added 10/18/2016 12:46 PM

In addition to excavation permit fee (per lineal foot)

$0.20 x 1,425 $285.00
Grand Total
Total $415.00
Due$415.00
This Application was canceled, so you may not pay for this Invoice.
Action: Print  

Approvals

ApprovalSignatureOptions
Applicant 
App. Status must be Pending Review OR Original Document Required OR Original Document Received OR Reviewed by Traffic Engineer
#1 Right of Way Technician Approval 
App. Status must be Pending Review OR Original Document Required OR Original Document Received OR Reviewed by Traffic Engineer
Text:
File(s):
    Text:
    File(s):