Excavation Permit Utility Installation Permit No. 2016-166, UID # 247
App. Status: Expired
Valid: 09/29/2016 - 10/14/2016
City of Maple Grove
Engineering Department
12800 Arbor Lakes Parkway
Maple Grove, MN 55369

Kelly Matzke (612-968-3615)
 

APPLICANT

Applicant:
Name:
Andy James Burke
Company:
SR Weidema
Company Phone:Local Phone:
(763428 - 9110
(612490 - 5474
Email Address:
aburke@srweidema.com
Mailing Address:
17600 113th Ave, North
Maple Grove MN 55369
Additional email address to notify: aburke@srweidema.com

PROJECT

Nature of Work:
Other
Surface to be disturbed:
Bituminous
Work to start on or after: 09/29/2016
To be completed on or before: 10/14/2016
Applicant Project No.: KM2415

INSTALLATION / CONSTRUCTION

Attach detailed plan sheet:
Size and kind of pipe:
15" RCP Storm Sewer
Depth from surface: Other, I will describe below
If other is selected, please provide additional information: 12 Feet
Length of utility construction: 57
Method of installation:
Open Trench
Machine excavation: Yes
Development: New

LOCATION

Location/Address: 82nd Avenue and 200' West of Deerwood Lane
Will traffic detouring be necessary? No

Terms

Requirements
  • Contact the Right-of-Way Technician by phone (612-968-3615) 24 hours prior to starting work, and upon completion so a final inspection can be completed in a timely manner.

  • You must adhere to [url=https://www.revisor.mn.gov/statutes/?id=216D]Minnesota Statutes 2015 CHAPTER 216D. EXCAVATION NOTICE SYSTEM[/url]

  • Notify all affected properties in writing prior to beginning work.

  • All cabinets, boxes, pedestals, etc. at corners must meet the City of Maple Grove's City Code, Sec. 360818 traffic visibility at corner lots.

  • All large trucks or large equipment are not allowed on any boulevard sidewalk or bituminous trails unless prior approval has been granted by the Right-of-Technician.

  • All signing for equipment in street must conform to the current MnDOT Manual on Uniform Traffic Control Devices.

  • Pneuma gophering is not allowed by the City of Maple Grove in this area.

  • All underground utilities must be placed a minimum of 36" and 48" maximum below finished top of curb elevation.

  • No hand holes or pot-holing in bituminous trails unless approved by the Right-of-Way Technician.

  • All disturbed areas must be returned to their original conditions within 30 days.

  • Lawn / Blvd areas must be restored per 28-105 of the Maple Grove Code of Ordinances.

  • Must adhere to MnDOT's Standard Specifications for Construction, Section 2575 and Maple Grove's specification for grading, landscaping and traffic control.

  • Notify Right-of Way Technician when work under this permit is completed, not at year's end.

  • Flag or mark utility location as required by state statue prior to calling in locates.

  • No work shall begin this year if it cannot be properly restored this year (unless emergency).

  • Street crossings to be installed perpendicular to street whenever possible.

Invoice #193 (09/21/2016)

Charge Cost Quantity Total
Grand Total
Total $0.00
Due$0.00
Action: Print  

Approvals

ApprovalSignatureOptions
ApplicantAndy J. Burke - 09/21/2016 8:50 AM
b4dc1454dedd435763b035ea6282ee74
e39c2961576294923e81b7a7fd191b16
 
#1 Approved ByKelly Matzke - 09/21/2016 1:15 PM
caeb8fbefafeaa166451e26b86438a52
5473a07bcf3155e8da6fa396c8c2ddd4
 
Application has been approved. All signatures have been obtained.