Excavation Permit Utility Installation Permit No. 2016-202, UID # 232
App. Status: Approved
Valid: 09/12/2016 - 06/30/2017
City of Maple Grove
Engineering Department
12800 Arbor Lakes Parkway
Maple Grove, MN 55369

Kelly Matzke (612-968-3615)
 

APPLICANT

Applicant:
Name:
sara achartz
Company:
centurylink
Company Phone:Local Phone:
(651312 - 7134
(612257 - 1032
Email Address:
sara.achartz@centurylink.com
Mailing Address:
425 Monroe St
Anoka MN 55303
Additional email address to notify: sara.achartz@centurylink.com

PROJECT

Nature of Work:
Main Installation
Surface to be disturbed:
Boulevard
Work to start on or after: 09/12/2016
To be completed on or before: 06/30/2017
Applicant Project No.: N.094992

INSTALLATION / CONSTRUCTION

Attach detailed plan sheet:
Size and kind of pipe:
New fiber 
Depth from surface: 36"- 48"
If other is selected, please provide additional information: 30
Length of utility construction: 4019
Method of installation:
Directional Bore
Machine excavation: Yes
Development: Existing

LOCATION

Location/Address: 93rd pl n and lawndale ln n
Mark the installation/construction
location on the map:
Mark the location of the installation
How to use:
1. Use only one option (dot, line, or polygon)
2. Made a mistake? Click on feature and press delete key.
Will traffic detouring be necessary? No

Terms

Requirements
  • Contact the Right-of-Way Technician by phone (612-968-3615) 24 hours prior to starting work, and upon completion so a final inspection can be completed in a timely manner.

  • You must adhere to [url=https://www.revisor.mn.gov/statutes/?id=216D]Minnesota Statutes 2015 CHAPTER 216D. EXCAVATION NOTICE SYSTEM[/url]

  • Notify all affected properties in writing prior to beginning work.

  • All cabinets, boxes, pedestals, etc. at corners must meet the City of Maple Grove's City Code, Sec. 360818 traffic visibility at corner lots.

  • All large trucks or large equipment are not allowed on any boulevard sidewalk or bituminous trails unless prior approval has been granted by the Right-of-Technician.

  • All signing for equipment in street must conform to the current MnDOT Manual on Uniform Traffic Control Devices.

  • Pneuma gophering is not allowed by the City of Maple Grove in this area.

  • All underground utilities must be placed a minimum of 36" and 48" maximum below finished top of curb elevation.

  • No hand holes or pot-holing in bituminous trails unless approved by the Right-of-Way Technician.

  • All disturbed areas must be returned to their original conditions within 30 days.

  • Lawn / Blvd areas must be restored per 28-105 of the Maple Grove Code of Ordinances.

  • Must adhere to MnDOT's Standard Specifications for Construction, Section 2575 and Maple Grove's specification for grading, landscaping and traffic control.

  • Notify Right-of Way Technician when work under this permit is completed, not at year's end.

  • Flag or mark utility location as required by state statue prior to calling in locates.

  • No work shall begin this year if it cannot be properly restored this year (unless emergency).

  • Street crossings to be installed perpendicular to street whenever possible.

Invoice #178 (09/09/2016)

Charge Cost Quantity Total
Non-Taxable
added 09/09/2016 1:01 PM

Excavation permit fee per occurance

$130.00 x 1 $130.00
added 09/09/2016 1:01 PM

In addition to excavation permit fee (per lineal foot)

$0.40 x 4,019 $1,607.60
Grand Total
Total $1,737.60
Payment 09/09/2016$1,737.60
Due$0.00

Approvals

ApprovalSignature
Applicantsara achartz - 09/09/2016 1:15 PM
67f26f9a5ca19ed2b7810caa4c2844d3
85d3eb8e851f7f41e08c222fc5df5d19
#1 Approved ByKelly Matzke - 10/17/2016 2:42 PM
e95a5945b18caf890c8b51161c60137a
0f4d4a6cc9e9ec8576cc7c7b6e54c158
Application has been approved. All signatures have been obtained.

Public Notes

Text:
Street crossings must be installed perpendicular to street whenever possible.
Projects over 1000 feet require meet with locators prior to starting work. 
Revised sketch has made adjustments to meet requirements by the City.
File(s):