City of Maple Grove
App. Status: Approved
Valid: 09/12/2016 - 06/30/2017City of Maple Grove
Engineering Department
12800 Arbor Lakes Parkway
Maple Grove, MN 55369
Kelly Matzke (612-968-3615)
APPLICANT
Applicant: |
|
||||||||||||||||||||||||||||||||||||||||
Additional email address to notify: | sara.achartz@centurylink.com |
PROJECT
Nature of Work: | Main Installation |
Surface to be disturbed: | Boulevard |
Work to start on or after: | 09/12/2016 |
To be completed on or before: | 06/30/2017 |
Applicant Project No.: | N.094992 |
INSTALLATION / CONSTRUCTION
Attach detailed plan sheet: |
|
Size and kind of pipe: | New fiber |
Depth from surface: | 36"- 48" |
If other is selected, please provide additional information: | 30 |
Length of utility construction: | 4019 |
Method of installation: | Directional Bore |
Machine excavation: | Yes |
Development: | Existing |
LOCATION
Location/Address: | 93rd pl n and lawndale ln n |
Mark the installation/construction location on the map: |
|
Mark the location of the installation How to use: 1. Use only one option (dot, line, or polygon) 2. Made a mistake? Click on feature and press delete key. |
|
Will traffic detouring be necessary? | No |
Terms
Contact the Right-of-Way Technician by phone (612-968-3615) 24 hours prior to starting work, and upon completion so a final inspection can be completed in a timely manner.
You must adhere to [url=https://www.revisor.mn.gov/statutes/?id=216D]Minnesota Statutes 2015 CHAPTER 216D. EXCAVATION NOTICE SYSTEM[/url]
Notify all affected properties in writing prior to beginning work.
All cabinets, boxes, pedestals, etc. at corners must meet the City of Maple Grove's City Code, Sec. 360818 traffic visibility at corner lots.
All large trucks or large equipment are not allowed on any boulevard sidewalk or bituminous trails unless prior approval has been granted by the Right-of-Technician.
All signing for equipment in street must conform to the current MnDOT Manual on Uniform Traffic Control Devices.
Pneuma gophering is not allowed by the City of Maple Grove in this area.
All underground utilities must be placed a minimum of 36" and 48" maximum below finished top of curb elevation.
No hand holes or pot-holing in bituminous trails unless approved by the Right-of-Way Technician.
All disturbed areas must be returned to their original conditions within 30 days.
Lawn / Blvd areas must be restored per 28-105 of the Maple Grove Code of Ordinances.
Must adhere to MnDOT's Standard Specifications for Construction, Section 2575 and Maple Grove's specification for grading, landscaping and traffic control.
Notify Right-of Way Technician when work under this permit is completed, not at year's end.
Flag or mark utility location as required by state statue prior to calling in locates.
No work shall begin this year if it cannot be properly restored this year (unless emergency).
Street crossings to be installed perpendicular to street whenever possible.
Invoice #178 (09/09/2016)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 09/09/2016 1:01 PM Excavation permit fee per occurance |
$130.00 | x 1 | $130.00 |
added 09/09/2016 1:01 PM In addition to excavation permit fee (per lineal foot) |
$0.40 | x 4,019 | $1,607.60 |
Grand Total | |||
Total | $1,737.60 | ||
Payment 09/09/2016 | $1,737.60 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | sara achartz - 09/09/2016 1:15 PM 67f26f9a5ca19ed2b7810caa4c2844d3 85d3eb8e851f7f41e08c222fc5df5d19 |
#1 Approved By | Kelly Matzke - 10/17/2016 2:42 PM e95a5945b18caf890c8b51161c60137a 0f4d4a6cc9e9ec8576cc7c7b6e54c158 |
Public Notes
Text: | Street crossings must be installed perpendicular to street whenever possible. Projects over 1000 feet require meet with locators prior to starting work. Revised sketch has made adjustments to meet requirements by the City. |
File(s): |
Internal Notes
Text: | |
File(s): |