Excavation Permit Utility Installation UID # 155
App. Status: Canceled
Valid: 08/10/2016 - 11/10/2016
City of Maple Grove
Engineering Department
12800 Arbor Lakes Parkway
Maple Grove, MN 55369

Kelly Matzke (612-968-3615)
 

APPLICANT

Applicant:
Name:
Kelly Doonan
Company:
Comcast
Company Phone:Local Phone:
(612369 - 5939
(612369 - 5939
Email Address:
kelly_doonan@cable.comcast.com
Mailing Address:
2611 Fairview Ave N.
Roseville MN 55113

PROJECT

Nature of Work:
Main Installation
Surface to be disturbed:
Boulevard
Work to start on or after: 08/10/2016
To be completed on or before: 11/10/2016

INSTALLATION / CONSTRUCTION

Attach detailed plan sheet:
Size and kind of pipe:
1.5" HDPE Conduit
Depth from surface: 36"- 48"
Length of utility construction: 3500
Method of installation:
Directional Bore
Machine excavation: Yes
Development: Existing

LOCATION

Location/Address: 6901 East Fish Lake Rd.
Mark the installation/construction
location on the map:
Mark the location of the installation
How to use:
1. Use only one option (dot, line, or polygon)
2. Made a mistake? Click on feature and press delete key.
Will traffic detouring be necessary? No

Invoice #120 (08/05/2016)

Charge Cost Quantity Total
Grand Total
Total $0.00
Due$0.00
This Application was canceled, so you may not pay for this Invoice.
Action: Print  

Approvals

ApprovalSignatureOptions
Applicant 
App. Status must be Pending Review OR Original Document Required OR Original Document Received OR Reviewed by Traffic Engineer
#1 Right of Way Technician Approval 
App. Status must be Pending Review OR Original Document Required OR Original Document Received OR Reviewed by Traffic Engineer
Text:
File(s):
    Text:
    File(s):
      Powered by