City of Maple Grove
Excavation Permit Utility Installation UID # 1202
App. Status: Canceled
Valid: 08/23/2017 - 09/30/2018City of Maple Grove
Engineering Department
12800 Arbor Lakes Parkway
Maple Grove, MN 55369
Kelly Matzke (612-968-3615)
App. Status: Canceled
Valid: 08/23/2017 - 09/30/2018City of Maple Grove
Engineering Department
12800 Arbor Lakes Parkway
Maple Grove, MN 55369
Kelly Matzke (612-968-3615)
APPLICANT
Applicant: |
|
PROJECT
Nature of Work: | Service Installation |
Surface to be disturbed: | Concrete |
Work to start on or after: | 08/23/2017 |
To be completed on or before: | 09/30/2018 |
INSTALLATION / CONSTRUCTION
Provide a detailed work description: | Run cable from the ped; under Ives ln 30' to bump ped then up to the complex; bore under the drive (22)as the hsbx is located where the home and drive meet. |
Attach detailed plan sheet: |
|
Size and kind of pipe: | 2" |
Depth from surface: | 36"- 48" |
Length of utility construction: | 52 |
Method of installation: | Directional Bore |
If other is selected, please provide additional information: | bore-30' under road and 22' under drive |
Machine excavation: | Yes |
Development: | Existing |
LOCATION
Location/Address: | 6901 Ives Ln |
Mark the installation/construction location on the map: |
|
Mark the location of the installation How to use: 1. Use only one option (dot, line, or polygon) 2. Made a mistake? Click on feature and press delete key. |
|
Will traffic control be necessary? | No |
Will any excavation be taking place on Hennepin County right-of-way? | No |
Invoice #1080 (08/28/2017)
Charge | Cost | Quantity | Total |
---|---|---|---|
Grand Total | |||
Total | $0.00 | ||
Due | $0.00 |
This Application was canceled, so you may not pay for this Invoice.
Action: Print
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | ||
#1 Right of Way Technician Approval |
Text: | |
File(s): |
Text: | |
File(s): |