Excavation Permit Utility Installation UID # 1202
App. Status: Canceled
Valid: 08/23/2017 - 09/30/2018
City of Maple Grove
Engineering Department
12800 Arbor Lakes Parkway
Maple Grove, MN 55369

Kelly Matzke (612-968-3615)
 

APPLICANT

Applicant:
Name:
Amy Clarke
Company:
D&D Service
Company Phone:Local Phone:
(763208 - 0195
(763208 - 0195
Email Address:
danddadmin@comcast.net
Mailing Address:
950 Co Rd 10, Ste 216
Spring Lake Park mn 55432

PROJECT

Nature of Work:
Service Installation
Surface to be disturbed:
Concrete
Work to start on or after: 08/23/2017
To be completed on or before: 09/30/2018

INSTALLATION / CONSTRUCTION

Provide a detailed work description:
Run cable from the ped; under Ives ln 30' to bump ped then up to the complex; bore under the drive (22)as the hsbx is located where the home and drive meet.
Attach detailed plan sheet:
Size and kind of pipe:
2"
Depth from surface: 36"- 48"
Length of utility construction: 52
Method of installation:
Directional Bore
If other is selected, please provide additional information:
bore-30' under road and 22' under drive
Machine excavation: Yes
Development: Existing

LOCATION

Location/Address: 6901 Ives Ln
Mark the installation/construction
location on the map:
Mark the location of the installation
How to use:
1. Use only one option (dot, line, or polygon)
2. Made a mistake? Click on feature and press delete key.
Will traffic control be necessary? No
Will any excavation be taking place on Hennepin County right-of-way? No

Invoice #1080 (08/28/2017)

Charge Cost Quantity Total
Grand Total
Total $0.00
Due$0.00
This Application was canceled, so you may not pay for this Invoice.

Approvals

ApprovalSignature
Applicant 
#1 Right of Way Technician Approval 

Public Notes

Text:
File(s):

    Internal Notes

    Text:
    File(s):
      Powered by