City of Maple Grove
Excavation Permit Utility Installation Permit No. 2023-EP184, UID # 6203
App. Status: ApprovedCity of Maple Grove
Engineering Department
12800 Arbor Lakes Parkway
Maple Grove, MN 55369
Kelly Matzke (612-968-3615)
App. Status: ApprovedCity of Maple Grove
Engineering Department
12800 Arbor Lakes Parkway
Maple Grove, MN 55369
Kelly Matzke (612-968-3615)
APPLICANT
Applicant: |
|
||||||||||||||||||||||||||||||||||||||||
Additional email address to notify: | patrick.edmonds-tlr@consulttlr.us |
CONTRACTOR
Contractor: |
|
PROJECT
Nature of Work: | Other |
Surface to be disturbed: | Boulevard |
Work to start on or after: | 07/12/2023 |
To be completed on or before: | 08/10/2023 |
Applicant Project No.: | 21112023E - JB1339209 |
INSTALLATION / CONSTRUCTION
Provide a detailed work description: | Contractor to set new node pedestal and handhole next to existing power supply. Once completed, contractor to change out existing equipment at locations shown in red on attached map. |
Attach detailed plan sheet: | |
Size and kind of pipe: | 2" hdpe |
Depth from surface: | Other, I will describe below |
If other is selected, please provide additional information: | 18" |
Length of utility construction: | 5 |
Method of installation: | Hand Dig Open Trench |
Development: | Existing |
LOCATION
Location/Address: | 9870 maple grove pkwy. |
Mark the location of the installation How to use: 1. Use only one option (dot, line, or polygon) 2. Made a mistake? Click on feature and press delete key. |
TRAFFIC CONTROL
Will traffic control be necessary? | Yes |
TRAFFIC CONTROL PLAN
Attach Traffic Control Plan: |
|
Invoice #5703 (05/22/2023)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 05/22/2023 2:40 PM Excavation permit fee per occurance |
$160.00 | x 1 | $160.00 |
added 05/22/2023 2:40 PM Add obstruction fee if applicable to project. |
$50.00 | x 1 | $50.00 |
Grand Total | |||
Total | $210.00 | ||
Payment 05/22/2023 | $210.00 | ||
Due | $0.00 |
Action: Print
SPECIAL PROVISIONS
It is assumed that the proposed work and/or staging will not impact pedestrian traffic along the existing sidewalks/trails. If the proposed work will impact pedestrian traffic, a revised traffic control plan will need to be submitted and approved.
Any proposed work and/or traffic control placed along this segment of Maple Grove Parkway is within County right-of-way, and will also require approval by Hennepin County.
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Ben Elsenpeter - 05/22/2023 2:40 PM a65df35bfe28a075955cfa0c364d88e4 ca7bafe85919a5f563a937cb1b1d0659 | |
#1 Right of Way Technician Approval | Kelly Matzke - 06/01/2023 8:03 AM 1e37d77a9acd63088f074fccaaf14938 7c83d63fb53ee909162c87cc9a6cc1f0 | |
#2 Traffic Operations Engineer Approval | John Hagen - 06/01/2023 10:00 AM 241d2fff599cb4e2b590a09363bb22b0 cfe5f70f61fe9002dfc822d8515aef4d |
Application has been approved. All signatures have been obtained.
Text: | |
File(s): |
Text: | |
File(s): |