City of Maple Grove
Excavation Permit Utility Installation UID # 5540
App. Status: CanceledCity of Maple Grove
Engineering Department
12800 Arbor Lakes Parkway
Maple Grove, MN 55369
Kelly Matzke (612-968-3615)
App. Status: CanceledCity of Maple Grove
Engineering Department
12800 Arbor Lakes Parkway
Maple Grove, MN 55369
Kelly Matzke (612-968-3615)
APPLICANT
Applicant: |
|
CONTRACTOR
Contractor: |
|
PROJECT
Nature of Work: | Main Installation |
Surface to be disturbed: | Bituminous* Turf |
Work to start on or after: | 08/01/2022 |
To be completed on or before: | 12/31/2022 |
Applicant Project No.: | 103772653 |
INSTALLATION / CONSTRUCTION
Provide a detailed work description: | MGC# 22-67326 CONTACT KEVIN SCOTT 612-321-5508 Main replacement |
Attach detailed plan sheet: | |
Size and kind of pipe: | 4" PLASTIC |
Depth from surface: | 36"- 48" |
Length of utility construction in feet: | 100 |
Method of installation: Note: Beginning July 1, 2025, all installations of underground telecommunications infrastructure must be performed by safety-qualified underground telecommunications installers that meet requirements per MN State Statute 326B.198. |
Directional Bore |
Development: | Existing |
LOCATION
Location/Address: | COUNTY RD 101 & 75 PL N MAPLE GROVE MN |
Invoice #5023 (07/26/2022)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 07/26/2022 12:05 PM Excavation permit fee per occurance |
$160.00 | x 1 | $160.00 |
Grand Total | |||
Total | $160.00 | ||
Payment 07/26/2022 | $160.00 | ||
Due | $0.00 |
This Application was canceled, so you may not pay for this Invoice.
Approvals
Approval | Signature |
---|---|
Applicant | Kimberly K. Ignatowicz - 07/26/2022 12:05 PM 7db8f561c435b8c668a9a5b737a5b7a5 931242259fc2adafb1b30c804e4941b2 |
#1 Right of Way Technician Approval | |
#2 Traffic Operations Engineer Approval |
Public Notes
Text: | |
File(s): |