APPLICANT
Applicant: |
|
CONTRACTOR
Contractor: |
|
PROJECT
Nature of Work: | Service Installation |
Surface to be disturbed: | Boulevard |
Work to start on or after: | 04/15/2022 |
To be completed on or before: | 12/31/2022 |
Applicant Project No.: | 97391 |
INSTALLATION / CONSTRUCTION
Provide a detailed work description: | Construction of fiber via directional bore |
Attach detailed plan sheet: | |
Size and kind of pipe: | (2) 1.25" Ducts and 48F HDPE |
Depth from surface: | 36"- 48" |
Length of utility construction: | 1443 |
Method of installation: | Directional Bore |
Development: | Existing |
LOCATION
Location/Address: | 6487 Sycamore Ct N |
Mark the location of the installation How to use: 1. Use only one option (dot, line, or polygon) 2. Made a mistake? Click on feature and press delete key. |
TRAFFIC CONTROL
Will traffic control be necessary? | Yes |
TRAFFIC CONTROL PLAN
Attach Traffic Control Plan: |
Terms
Public right-of-way. "Public right-of-way" means the area on, below, or above a public roadway, highway, street, cartway, bicycle lane, and public sidewalk in which the local government unit has an interest, including other dedicated rights-of-way for travel purposes and utility easements of local government units. A public right-of-way does not include the airwaves above a public right-of-way with regard to cellular or other nonwire telecommunications or broadcast service.
Contact Kelly Matzke at (612) 968-3615 at least 24 hours prior to construction to activate permit. Failure to contact Mr. Matzke to activate permit prior to work being started shall be considered a violation of the permit and grounds for dismissing contractor from the job site.
(1) Article IV. Public Right-of-Way Management Ordinance will be enforced for work being done in the right-of-way. (2) All excavations taking place in right-of-way must conform to Minnesota Statute Chapter 216D. Excavation Notice System. (3) All rules and regulations for locates must conform to the most current Gopher State One Handbook. (4) Excavations taking place in the Maple Grove city limits in the Hennepin County right-of-way requires permits from the City of Maple Grove and Hennepin County. (5) All properties affected by excavation and construction must be notified in writing prior to beginning work. (6) The permit issued does not in any way imply an easement on private property or grant a right to encroach on private property. (7) A City of Maple Grove Excavation Permit shall be on site at all times and available upon request by any city official. (8) Safety vests must be worn by all people occupying the right-of-way.
(1) All underground utilities must be placed a minimum of 36" and 48" maximum below finished top of curb elevation. (2) Any placement of utilities, including but not limited to cabinets, boxes, and pedestals must conform to city code. (3) Absolutely no removal of bituminous or concrete is allowed without prior approval from the City of Maple Grove. (4) Core drilling is not allowed in street, sidewalk, or trail without prior approval from City of Maple Grove. The City of Maple Grove does not allow core drilling to take place in ped ramps. (5) Vehicles, equipment, and materials are not allowed on sidewalks, trails, or ped ramps at any time unless the contractor performing work has exhausted all other alternatives, including, but not limited to lane closures, boulevard parking, etc. If it has been determined that all alternatives have been exhausted, permission must be obtained from City representative before proceeding to use sidewalks, trails, or ped ramps. (6) Any changes or revisions to the Excavation Permit after approval must be resubmitted and approved before proceeding with work in the right-of-way. (7) Street crossings must be installed perpendicular to the road to avoid future potholing in street. (8) Plowing and pneuma gophering are not acceptable forms of excavation allowed in the City of Maple Grove. (9) All open trenches and holes must be backfilled before leaving work site at the end of the day. (10) All flags from locates must be removed and picked up immediately once excavation has been completed. (11) Inclement weather shall be reason for delay of the project start or suspension of the project as determined by the City of Maple Grove.
(1) All permit applications requiring traffic control shall conform to the most recent version of the Minnesota Manual on Uniform Traffic Control Devices, including the Temporary Traffic Control Zone Layouts Field Manual, and be approved by the Transportation Operations Engineer. (2) The City of Maple Grove only allows traffic control to occur during off peak hours, which is between 9:00am-3:00 pm Monday thru Friday. (3) All traffic control devices must be removed from the job site promptly upon completion of work. (4) Traffic control on weekends requires prior approval from Transportation Operations Engineer John Hagen. John can be reached via email at jhagen@maplegrovemn.gov or 763-494-6364.
(1) Restoration must conform to Section 28-105. Restoration of Right-of-Way. (2) Restoration Requirements on Soft Surfaces. (a) Turf: Hydroseeding is required unless otherwise directed by Right-of-Way Technician. (b) Soil: Six inches of topsoil is required on all boulevards that are damaged. (c) Sprinklers: Restore to prior condition with like materials and equipment. (d) Pet Fences: Check for continuity after repair. (e) Landscaping: Restore to original with like materials. 3) Removal/Restoration Requirements on Hard Surfaces. (a) Bituminous: Shall be removed and restored in a timely matter to its original or better condition. (b) Concrete: Shall be removed and restored in a timely matter to its original or better condition. (c) Driveways: Notify Right-of-Way Technician of any damage and address with homeowner. (4) Restoration Requirements in areas where core drills were approved. (a) Bituminous: Core drills in bituminous paths are replaced at width of path (example: 8 foot wide path is replaced 8'x8' per core). (b) Concrete: Core drills in sidewalks require a minimum of two panels to be replaced per core to assure base has been properly reestablished. (5) All disturbed areas during excavation must be restored to their original condition within 30 days. (6) Damage on boulevards due to vehicles and equipment must be restored and treated the same way that excavation damage is restored. (7) Work completed in winter months must notify City with plans for restoration to take place in the spring.
(1) All contractors, including subcontractors, must be registered with the City of Maple Grove to do work in the right-of-way. Contractors doing work in the right-of-way that are not registered with the city will be considered in violation, and will be dismissed from the work site until registration is completed. (2) Absolutely no removal of bituminous or concrete is allowed during winter months.
By submitting this application, I (applicant/company) hereby acknowledge that I must adhere to all provisions of City of Maple Grove Code and all applicable ordinances, including statute 237.162 and 237.163 in addition to the terms and conditions which are attached to this document. The applicant shall also comply with the regulations of all other governmental agencies for the protection of the public.
Invoice #4665 (03/31/2022)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 03/31/2022 12:49 PM Excavation permit fee per occurance |
$160.00 | x 1 | $160.00 |
Grand Total | |||
Total | $160.00 | ||
Payment 03/31/2022 | $160.00 | ||
Due | $0.00 |
Invoice #5362 (12/15/2022)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 12/15/2022 11:06 AM In addition to excavation permit fee (per lineal foot) |
$0.40 | x 1,343 | $537.20 |
Grand Total | |||
Total | $537.20 | ||
Payment 12/20/2022 | $537.20 | ||
Due | $0.00 |
SPECIAL PROVISIONS
It is assumed that the proposed work will not impact pedestrian traffic along the existing sidewalks/trails. If the proposed work will impact pedestrian traffic along existing sidewalks/trails, a revised traffic control plan will need to be submitted and approved.
Approvals
Approval | Signature |
---|---|
Applicant | Brett Christenson - 04/28/2022 3:50 PM 6a4b6d4cf2d20e48d8411f479c227f91 e9748650c1ac4ff6fb474e09084d5ac7 |
#1 Right of Way Technician Approval | Kelly Matzke - 05/02/2022 10:34 AM 8efe2d589da71407bbe80fd5c28ac0ab 8f656cdeb3b2f968805a316deda2a78f |
#2 Traffic Operations Engineer Approval | John Hagen - 05/02/2022 2:30 PM 1b4148d1643ef8fbce456d5b4d9bc231 369a766f79206161726928f2dd31c68f |