City of Maple Grove
Excavation Permit Utility Installation Permit No. 2021-EP065, UID # 4420
App. Status: ApprovedCity of Maple Grove
Engineering Department
12800 Arbor Lakes Parkway
Maple Grove, MN 55369
Kelly Matzke (612-968-3615)
App. Status: ApprovedCity of Maple Grove
Engineering Department
12800 Arbor Lakes Parkway
Maple Grove, MN 55369
Kelly Matzke (612-968-3615)
APPLICANT
Applicant: |
|
CONTRACTOR
Contractor: |
|
PROJECT
Nature of Work: | Main Installation |
Surface to be disturbed: | Gravel |
Work to start on or after: | 07/01/2021 |
To be completed on or before: | 03/31/2022 |
INSTALLATION / CONSTRUCTION
Provide a detailed work description: | Joint trench backbone for new subdivision. |
Attach detailed plan sheet: | |
Size and kind of pipe: | 4" PVC conduits |
Depth from surface: | 36"- 48" |
Length of utility construction: | 4200 |
Method of installation: | Directional Bore Hand Dig Open Trench Joint Trench (Xcel Energy) Other |
If other is selected, please provide additional information: | Installing new 45/2 pole in ROW for new subdivision. |
Development: | New |
LOCATION
Location/Address: | 10036 Nathan Ln, Maple Grove |
Mark the location of the installation How to use: 1. Use only one option (dot, line, or polygon) 2. Made a mistake? Click on feature and press delete key. |
TRAFFIC CONTROL
Will traffic control be necessary? | No |
Invoice #3902 (03/24/2021)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 03/24/2021 10:53 AM Excavation permit fee per occurance |
$160.00 | x 1 | $160.00 |
added 03/24/2021 10:53 AM In addition to excavation permit fee (per lineal foot) |
$0.20 | x 4,200 | $840.00 |
Grand Total | |||
Total | $1,000.00 | ||
Payment 03/24/2021 | $1,000.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | Fong Yang - 03/24/2021 10:54 AM a9955520cd085fb083b757d72434b60b e5307aa1f228f7493a6d72e2d317487e |
#1 Right of Way Technician Approval | Kelly Matzke - 05/03/2021 8:11 AM 3d4903f5aea342591b3390946b3ae9ba f8c1cb6179ba6db4575c2095cd576591 |
Application has been approved. All signatures have been obtained.
Public Notes
Text: | |
File(s): |
Internal Notes
Text: | |
File(s): |