City of Maple Grove
Excavation Permit Utility Installation Permit No. 2021-EP015, UID # 4282
App. Status: ActivatedCity of Maple Grove
Engineering Department
12800 Arbor Lakes Parkway
Maple Grove, MN 55369
Kelly Matzke (612-968-3615)
App. Status: ActivatedCity of Maple Grove
Engineering Department
12800 Arbor Lakes Parkway
Maple Grove, MN 55369
Kelly Matzke (612-968-3615)
APPLICANT
Applicant: |
|
||||||||||||||||||||||||||||||||||||||||
Additional email address to notify: | ssandkamp@usi-universal.com |
CONTRACTOR
Contractor: |
|
PROJECT
Nature of Work: | Main Installation |
Surface to be disturbed: | Boulevard |
Work to start on or after: | 02/17/2021 |
To be completed on or before: | 12/31/2021 |
Applicant Project No.: | Comcast JB-558739 |
INSTALLATION / CONSTRUCTION
Provide a detailed work description: | Pulling fiber through existing conduit, place new vault/pedestal. |
Attach detailed plan sheet: |
|
Size and kind of pipe: | 1.5" HDPE |
Depth from surface: | 36"- 48" |
Length of utility construction: | 4 |
Method of installation: | Hand Dig |
Development: | Existing |
LOCATION
Location/Address: | 63rd Ave. N, Wedgewood Rd.(Yucca Ln.) |
Mark the location of the installation How to use: 1. Use only one option (dot, line, or polygon) 2. Made a mistake? Click on feature and press delete key. |
TRAFFIC CONTROL
Will traffic control be necessary? | Yes |
TRAFFIC CONTROL PLAN
Attach Traffic Control Plan: |
|
Invoice #3764 (02/05/2021)
Charge | Cost | Quantity | Total |
---|---|---|---|
Grand Total | |||
Total | $0.00 | ||
Due | $0.00 |
Action: Print
SPECIAL PROVISIONS
It is assumed that the proposed work will not impact pedestrian traffic along the existing sidewalks/trails. If the proposed work will impact any pedestrian facilities, an updated traffic control plan will need to be submitted and approved.
Any proposed work and/or traffic control placed within County right-of-way (i.e. - Bass Lake Road) will need approval by Hennepin County.
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Chong Vang - 02/05/2021 4:02 PM b4f29c6bcbc9eba431f3f55cb8e8e423 dd85b99550eb49f2374943bb4dc6814d | |
#1 Right of Way Technician Approval | Kelly Matzke - 02/09/2021 9:18 AM 926fdb9cf42de37d59d8aaa16ea55560 b3c3d173b1e4b097853276589be8f5c9 | |
#2 Traffic Operations Engineer Approval | John Hagen - 02/09/2021 10:45 AM c7733a0be5ca799f18300923387f8f2b 6ab446cf49935942ab40604f503da372 |
Application has been approved. All signatures have been obtained.
Text: | |
File(s): |
Text: | |
File(s): |