Excavation Permit Utility Installation Permit No. 2021-EP055, UID # 4006
App. Status: Work Completed
City of Maple Grove
Engineering Department
12800 Arbor Lakes Parkway
Maple Grove, MN 55369

Kelly Matzke (612-968-3615)
 

APPLICANTHide

Applicant:
Name:
Kimberly Kay Ignatowicz
Company:
CenterPoint Energy
Company Phone:Local Phone:
(612321 - 5325
(612321 - 5325
Email Address:
kimberly.ignatowicz@centerpointenergy.com
Mailing Address:
700 W Linden Ave
Minneapolis MN 55440

CONTRACTORHide

Contractor:
Name:
Kimberly Kay Ignatowicz
Company:
Michels Corporation
Company Phone:Local Phone:
(952469 - 8000
(612321 - 5325
Email Address:
kimberly.ignatowicz@centerpointenergy.com
Mailing Address:
22100 Pillsbuty Ave
Lakeville MN 55044

PROJECTHide

Nature of Work:
Main Installation
Surface to be disturbed:
Turf
Work to start on or after: 09/21/2020
To be completed on or before: 12/31/2022
Applicant Project No.: 95026020

INSTALLATION / CONSTRUCTIONHide

Provide a detailed work description:
MGC# 20-3348 
CONTACT MARCIA KOLSTAD 612-321-5482
NATURAL GAS 
MAIN INSTALLATION VIA JOINT TRENCH
Attach detailed plan sheet:
Size and kind of pipe:
4" & 6" PLASTIC
Depth from surface: 36"- 48"
Length of utility construction in feet: 3655
Method of installation:
Note: Beginning July 1, 2025, all installations of underground telecommunications infrastructure must be performed by safety-qualified underground telecommunications installers that meet requirements per MN State Statute 326B.198.
Joint Trench
Development: New

LOCATIONHide

Location/Address: GROVE CIR N & HEALTH WAY MAPLE GROVE MN
Mark the location of the installation
How to use:
1. Use only one option (dot, line, or polygon)
2. Made a mistake? Click on feature and press delete key.
MapBox

TRAFFIC CONTROLHide

Proposed work that impacts vehicle and/or pedestrian traffic will require a traffic control plan. Will traffic control be necessary? No

Invoice #3526 (08/19/2020)Hide

Charge Cost Quantity Total
Non-Taxable
added 08/19/2020 9:10 AM

$130.00 x 1 $130.00
added 08/19/2020 9:10 AM

In addition to excavation permit fee (per lineal foot)

$0.20 x 3,655 $731.00
Grand Total
Total $861.00
Payment 08/19/2020$861.00
Due$0.00
Action: Print  

ApprovalsHide

ApprovalSignatureOptions
ApplicantKimberly K. Ignatowicz - 08/19/2020 9:10 AM
93b66dae8fd57704ed162f1e61395d2c
c9684596583c392fe8cbb7c053f429ef
 
#1 Right of Way Technician ApprovalKelly Matzke - 04/19/2021 7:53 AM
cd83f143d71c8553e0e644b099fd78f3
6f8e1e9caf229d3e22324ab95507f754
 
Application has been approved. All signatures have been obtained.
Text:
File(s):
    Text:
    File(s):