Applicant: |
|
PROJECT
Nature of Work: | Main Installation |
Surface to be disturbed: | Boulevard |
Work to start on or after: | 10/24/2016 |
To be completed on or before: | 12/01/2016 |
Applicant Project No.: | NW427 |
INSTALLATION / CONSTRUCTION
Attach detailed plan sheet: |
|
Size and kind of pipe: | 1-1-1/2 Cable In Conduit |
Depth from surface: | Other, I will describe below |
If other is selected, please provide additional information: | 24-36'' |
Length of utility construction: | 464 |
Method of installation: | Directional Bore |
Machine excavation: | No |
Development: | Existing |
LOCATION
Location/Address: | 9825 Alvarado Lane |
Will traffic detouring be necessary? | No |
Terms
Contact the Right-of-Way Technician by phone (612-968-3615) 24 hours prior to starting work, and upon completion so a final inspection can be completed in a timely manner.
You must adhere to [url=https://www.revisor.mn.gov/statutes/?id=216D]Minnesota Statutes 2015 CHAPTER 216D. EXCAVATION NOTICE SYSTEM[/url]
Notify all affected properties in writing prior to beginning work.
All cabinets, boxes, pedestals, etc. at corners must meet the City of Maple Grove's City Code, Sec. 360818 traffic visibility at corner lots.
All large trucks or large equipment are not allowed on any boulevard sidewalk or bituminous trails unless prior approval has been granted by the Right-of-Technician.
All signing for equipment in street must conform to the current MnDOT Manual on Uniform Traffic Control Devices.
Pneuma gophering is not allowed by the City of Maple Grove in this area.
All underground utilities must be placed a minimum of 36" and 48" maximum below finished top of curb elevation.
No hand holes or pot-holing in bituminous trails unless approved by the Right-of-Way Technician.
All disturbed areas must be returned to their original conditions within 30 days.
Lawn / Blvd areas must be restored per 28-105 of the Maple Grove Code of Ordinances.
Must adhere to MnDOT's Standard Specifications for Construction, Section 2575 and Maple Grove's specification for grading, landscaping and traffic control.
Notify Right-of Way Technician when work under this permit is completed, not at year's end.
Flag or mark utility location as required by state statue prior to calling in locates.
No work shall begin this year if it cannot be properly restored this year (unless emergency).
Street crossings to be installed perpendicular to street whenever possible.
Invoice #246 (10/19/2016)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 10/19/2016 7:17 AM Excavation permit fee per occurance |
$130.00 | x 1 | $130.00 |
added 10/19/2016 7:17 AM In addition to excavation permit fee (per lineal foot) |
$0.40 | x 464 | $185.60 |
Grand Total | |||
Total | $315.60 | ||
Payment 01/10/2018 | $315.60 | ||
Due | $0.00 |
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | Doug A. Zahn - 10/19/2016 7:17 AM 9ac31ad09f8edfa2a9bc1c4dc431c937 6f1d226d2dee0687616b81a19335d58e | |
#1 Approved By | Kelly Matzke - 10/24/2016 9:22 AM d35d9d29ff7a466347d4819b6dd4dc3c f6d83cdcd21e5dbb909dc361691c2353 |
Text: | |
File(s): |
Text: | |
File(s): |