Excavation Permit Utility Installation Permit No. 2019-235, UID # 3266
App. Status: Approved
City of Maple Grove
Engineering Department
12800 Arbor Lakes Parkway
Maple Grove, MN 55369

Kelly Matzke (612-968-3615)
 

APPLICANT

Applicant:
Name:
Ryan Daniels
Company:
Wright Hennepin Electric
Company Phone:Local Phone:
(763477 - 3000
(612719 - 9811
Email Address:
rdaniels@whe.org
Mailing Address:
PO Box 330
Rockford MN 55373 0330
Additional email address to notify: rdaniels@whe.org

CONTRACTOR

Contractor:
Name:
Ryan Daniels
Company:
Wright Hennepin
Company Phone:Local Phone:
(612719 - 9811
(763477 - 0000
Email Address:
rdaniels@whe.org
Mailing Address:
6800 Electric Drive
Rockford MN 55373

PROJECT

Nature of Work:
Main Installation
Surface to be disturbed:
Boulevard
Work to start on or after: 09/03/2019
To be completed on or before: 12/31/2021
Applicant Project No.: 869798

INSTALLATION / CONSTRUCTION

Provide a detailed work description:
We are installing a tie line and switch for the Duke Reality Buildings
Attach detailed plan sheet:
Size and kind of pipe:
5" HDPE
Depth from surface: 36"- 48"
Length of utility construction: 2500
Method of installation:
Directional Bore
Open Trench
Machine excavation: Yes
Development: Existing

LOCATION

Location/Address: Fountains Dr. and Zachary Ln.
Mark the location of the installation
How to use:
1. Use only one option (dot, line, or polygon)
2. Made a mistake? Click on feature and press delete key.
Will traffic control be necessary? No
Will any excavation be taking place on Hennepin County right-of-way? No

Invoice #2828 (08/26/2019)

Charge Cost Quantity Total
Non-Taxable
added 08/26/2019 2:20 PM

Excavation permit fee per occurance

$160.00 x 1 $160.00
added 08/26/2019 2:20 PM

In addition to excavation permit fee (per lineal foot)

$0.40 x 2,500 $1,000.00
Grand Total
Total $1,160.00
Payment 08/26/2019$1,160.00
Due$0.00
Action: Print  

Approvals

ApprovalSignatureOptions
ApplicantRyan Daniels - 08/26/2019 2:20 PM
d93701394c0d32763569e91632bcd81c
5af686bfbf2a7b9eb94673e5c86bd1bb
 
#1 Approved ByKelly Matzke - 08/29/2019 8:41 AM
0314585342724ec93629ef50e05c2fd7
9e633b51feff510a6e8042a9e9484984
 
Application has been approved. All signatures have been obtained.
Text:
File(s):
    Text:
    11.7.19 Ryan Daniels said this job will be delayed until next spring.  Will extend permit at that time.
    File(s):
      Powered by