Excavation Permit Utility Installation UID # 185
App. Status: Canceled
Valid: 08/22/2016 - 09/02/2016
City of Maple Grove
Engineering Department
12800 Arbor Lakes Parkway
Maple Grove, MN 55369

Kelly Matzke (612-968-3615)
 

APPLICANT

Applicant:
Name:
Megan Barthel
Company:
Midwest Landscapes, Inc.
Company Phone:Local Phone:
(612470 - 9389
(612470 - 9389
Email Address:
mbarthel@midwestlandscapes.com
Mailing Address:
6221 Oakwood Ave NE
6221 Oakwood Ave NE
Otsego MN 55330

PROJECT

Nature of Work:
Main Installation
Surface to be disturbed:
Boulevard
Work to start on or after: 08/22/2016
To be completed on or before: 09/02/2016

INSTALLATION / CONSTRUCTION

Attach detailed plan sheet:
Size and kind of pipe:
Poly 1.25" & PVC 2.0"
Depth from surface: Other, I will describe below
If other is selected, please provide additional information: 12"-18"
Length of utility construction: 1000
Method of installation:
Open Trench
Machine excavation: Yes
Development: New

LOCATION

Location/Address: Donegal
Will traffic detouring be necessary? No

Terms

Requirements
  • Contact the Right-of-Way Technician by phone (612-968-3615) 24 hours prior to starting work, and upon completion so a final inspection can be completed in a timely manner.

  • You must adhere to [url=https://www.revisor.mn.gov/statutes/?id=216D]Minnesota Statutes 2015 CHAPTER 216D. EXCAVATION NOTICE SYSTEM[/url]

  • Notify all affected properties in writing prior to beginning work.

  • All cabinets, boxes, pedestals, etc. at corners must meet the City of Maple Grove's City Code, Sec. 360818 traffic visibility at corner lots.

  • All large trucks or large equipment are not allowed on any boulevard sidewalk or bituminous trails unless prior approval has been granted by the Right-of-Technician.

  • All signing for equipment in street must conform to the current MnDOT Manual on Uniform Traffic Control Devices.

  • Pneuma gophering is not allowed by the City of Maple Grove in this area.

  • All underground utilities must be placed a minimum of 36" and 48" maximum below finished top of curb elevation.

  • No hand holes or pot-holing in bituminous trails unless approved by the Right-of-Way Technician.

  • All disturbed areas must be returned to their original conditions within 30 days.

  • Lawn / Blvd areas must be restored per 28-105 of the Maple Grove Code of Ordinances.

  • Must adhere to MnDOT's Standard Specifications for Construction, Section 2575 and Maple Grove's specification for grading, landscaping and traffic control.

  • Notify Right-of Way Technician when work under this permit is completed, not at year's end.

  • Flag or mark utility location as required by state statue prior to calling in locates.

  • No work shall begin this year if it cannot be properly restored this year (unless emergency).

  • Street crossings to be installed perpendicular to street whenever possible.

Invoice #146 (08/18/2016)

Charge Cost Quantity Total
Non-Taxable
added 08/18/2016 4:07 PM

Excavation permit fee per occurance

$130.00 x 1 $130.00
added 08/18/2016 4:07 PM

In addition to excavation permit fee (per lineal foot)

$0.20 x 1,000 $200.00
Grand Total
Total $330.00
Due$330.00
This Application was canceled, so you may not pay for this Invoice.

Approvals

ApprovalSignature
Applicant 
#1 Right of Way Technician Approval 

Public Notes

Text:
File(s):

    Internal Notes

    Text:
    File(s):
      Powered by