City of Maple Grove
Excavation Permit Utility Installation UID # 1321
App. Status: Canceled
Valid: 10/13/2017 - 01/26/2018City of Maple Grove
Engineering Department
12800 Arbor Lakes Parkway
Maple Grove, MN 55369
Kelly Matzke (612-968-3615)
App. Status: Canceled
Valid: 10/13/2017 - 01/26/2018City of Maple Grove
Engineering Department
12800 Arbor Lakes Parkway
Maple Grove, MN 55369
Kelly Matzke (612-968-3615)
APPLICANT
Applicant: |
|
PROJECT
Nature of Work: | Service Installation |
Surface to be disturbed: | Boulevard |
Work to start on or after: | 10/13/2017 |
To be completed on or before: | 01/26/2018 |
Applicant Project No.: | 17217935 |
INSTALLATION / CONSTRUCTION
Provide a detailed work description: | Plow 135 feet of 1s fiber, including a bore under driveway at 10667 105th Ave N from ped to house. |
Size and kind of pipe: | 1s fiber |
Depth from surface: | 36"- 48" |
Length of utility construction: | 135 |
Method of installation: | Other |
If other is selected, please provide additional information: | Plow and Bore |
Machine excavation: | Yes |
Development: | Existing |
Invoice #1134 (10/11/2017)
Charge | Cost | Quantity | Total |
---|---|---|---|
Grand Total | |||
Total | $0.00 | ||
Due | $0.00 |
This Application was canceled, so you may not pay for this Invoice.
Action: Print
Approvals
Approval | Signature | Options |
---|---|---|
Applicant | ||
#1 Right of Way Technician Approval |
Text: | |
File(s): |
Text: | |
File(s): |