Excavation Permit Utility Installation UID # 1321
App. Status: Canceled
Valid: 10/13/2017 - 01/26/2018
City of Maple Grove
Engineering Department
12800 Arbor Lakes Parkway
Maple Grove, MN 55369

Kelly Matzke (612-968-3615)
 

APPLICANT

Applicant:
Name:
jane Brown
Company:
Telcom Construction
Company Phone:Local Phone:
(320365 - 0086
(320365 - 0086
Email Address:
jane.brown@telcomconstruction.com
Mailing Address:
PO BOX 189
Clearwater mn 55320

PROJECT

Nature of Work:
Service Installation
Surface to be disturbed:
Boulevard
Work to start on or after: 10/13/2017
To be completed on or before: 01/26/2018
Applicant Project No.: 17217935

INSTALLATION / CONSTRUCTION

Provide a detailed work description:
Plow 135 feet of 1s fiber, including a bore under driveway at 10667  105th Ave N from ped to house.
Size and kind of pipe:
1s fiber
Depth from surface: 36"- 48"
Length of utility construction: 135
Method of installation:
Other
If other is selected, please provide additional information:
Plow and Bore
Machine excavation: Yes
Development: Existing

Invoice #1134 (10/11/2017)

Charge Cost Quantity Total
Grand Total
Total $0.00
Due$0.00
This Application was canceled, so you may not pay for this Invoice.
Action: Print  

Approvals

ApprovalSignatureOptions
Applicant 
App. Status must be Pending Review OR Original Document Required OR Original Document Received OR Reviewed by Traffic Engineer
#1 Right of Way Technician Approval 
App. Status must be Pending Review OR Original Document Required OR Original Document Received OR Reviewed by Traffic Engineer
Text:
File(s):
    Text:
    File(s):
      Powered by