City of Maple Grove
Excavation Permit Utility Installation UID # 1104
App. Status: Returned for Changes
Valid: 06/23/2017 - 06/27/2017City of Maple Grove
Engineering Department
12800 Arbor Lakes Parkway
Maple Grove, MN 55369
Kelly Matzke (612-968-3615)
App. Status: Returned for Changes
Valid: 06/23/2017 - 06/27/2017City of Maple Grove
Engineering Department
12800 Arbor Lakes Parkway
Maple Grove, MN 55369
Kelly Matzke (612-968-3615)
APPLICANT
Applicant: |
|
PROJECT
Nature of Work: | Main Installation |
Surface to be disturbed: | Gravel |
Work to start on or after: | 06/23/2017 |
To be completed on or before: | 06/27/2017 |
INSTALLATION / CONSTRUCTION
Depth from surface: | 36"- 48" |
Method of installation: Note: Beginning July 1, 2025, all installations of underground telecommunications infrastructure must be performed by safety-qualified underground telecommunications installers that meet requirements per MN State Statute 326B.198. |
Hand Dig Open Trench Joint Trench |
Invoice #957 (06/22/2017)
Charge | Cost | Quantity | Total |
---|---|---|---|
Grand Total | |||
Total | $0.00 | ||
Due | $0.00 |
Action: Print
Text: | |
File(s): |
Text: | |
File(s): |