City of Maple Grove
App. Status: ApprovedCity of Maple Grove
Engineering Department
12800 Arbor Lakes Parkway
Maple Grove, MN 55369
Kelly Matzke (612-968-3615)
APPLICANT
Applicant: |
|
||||||||||||||||||||||||||||||||||||||||
Additional email address to notify: | patrick.edmonds-tlr@consulttlr.us |
CONTRACTOR
Contractor: |
|
OBSTRUCTION
Reason for obstruction: | Splicing and changing out of existing equipment at locations shown in red on attached map. |
Right-of-Way being obstructed: | Boulevard |
Attach detailed plan sheet: |
|
Obstruction to start on or after: | 07/03/2023 |
Obstruction to be completed on or before: | 07/20/2023 |
Applicant Project No.: | 21112023E - JB1362006 |
LOCATION
Location/Address: | 15406 territorial rd. |
Mark the location of the obstruction: |
TRAFFIC CONTROL
Will traffic control be necessary? | Yes |
TRAFFIC CONTROL PLAN
Attach Traffic Control Plan: |
|
Terms
Public right-of-way. "public right-of-way" means the area on, below, or above a public roadway, highway, street, cartway, bicycle lane, and public sidewalk in which the local government unit has an interest, including other dedicated rights-of-way for travel purposes and utility easements of local government units. A public right-of-way does not include the airwaves above a public right-of-way with regard to cellular or other nonwire telecommunications or broadcast service.
City. "City" means the City of Maple Grove, Minnesota
Indemnified Parties. "Indemnified Parties" means the City and its elected and appointed officials, officers, employees, contractors, and agents.
Terms and Conditions. "Terms and Conditions" means these 2023 Terms and Conditions on Obstruction Permit.
Contact Kelly Matzke at (612) 968-3615 at least 24 hours prior to obstruction to activate permit. Failure to contact Mr. Matzke to activate permit prior to work being started shall be considered a violation of the permit and grounds for dismissing contractor from the job site and revocation of permit approval.
(1) City Code Art. IV.- Public Right-of-Way Management will be enforced for obstruction in the public right-of-way. (2) Underground installation requirements are determined through City Code 28-124. (3) Obstructions taking place in the Maple Grove city limits in the Hennepin County public right-of-way requires permits from the City and Hennepin County. (4) All properties affected by the obstruction must be notified in writing prior to beginning work. (5) The permit issued does not in any way imply an easement on private property or grant a right to encroach on private property. (6) A City Obstruction Permit shall be on site at all times and available upon request by any City official. (7) Safety vests must be worn by all people occupying the right-of-way; and (8) Any work involving excavation, such as but not limited to digging, boring, or physically disturbing the right-of-way, will require an Excavation Permit instead of an Obstruction Permit.
(1) Vehicles, equipment, and materials are not allowed on sidewalks, trails, or ped ramps at any time unless the contractor performing work has exhausted all other alternatives, including, but not limited to lane closures and boulevard parking. If it has been determined that all alternatives have been exhausted, permission must be obtained from City representative before proceeding to use sidewalks, trails, or ped ramps. (2) Any placement of utilities, including but not limited to cabinets, boxes, and pedestals must conform to City Code. (3) Any changes or revisions to the City Obstruction Permit after approval must be resubmitted, subject to the review and approval of the City Director of Public Works or designee before proceeding with obstructing the public right-of-way; and ((4) Inclement weather shall be reason for delay or suspension of obstruction as determined by the City.
(1) All permit applications requiring traffic control shall conform to the most recent version of the Minnesota Manual on Uniform Traffic Control Devices, including but not limited to the Temporary Traffic Control Zone Layouts Field Manual, and is subject to the review and approval of the City Transportation Operations Engineer. (2) The City only allows traffic control to occur during off peak hours, which is between 9:00am-3:00 pm Monday thru Friday. (3) All traffic control devices must be removed from the job site promptly upon completion of work; and (4) Traffic control on weekends requires prior approval from City Transportation Operations Engineer John Hagen. John can be reached via email at jhagen@maplegrovemn.gov or (763) 494-6364.
Damage on roadways and boulevards due to vehicles or equipment must be restored and treated the same way excavation damage is restored. Restoration must conform to City Code 28-105.
All contractors, including subcontractors, must be registered with the City to do work in the public right-of-way. Contractors doing work in the public right-of-way that are not registered with the City will be considered in violation, and will be dismissed from the work site until registration is completed.
(1) By reason of the grant of a public right-of-way permits, the City does not assume any liability for injuries to persons, damage to property, or loss of service claims by parties other than the permittee or the City or claims or penalties of any sort resulting from the installation, presence, maintenance, or operation of equipment by permittee or activities of permittee; (2) The permittee shall, in accordance with Minn. R. 7819.1250, defend, indemnify, and hold harmless the Indemnified Parties from all liability or claims of liability for bodily injury or death to persons, or for property damage, in which the claim: (a) alleges a negligent or otherwise wrongful act or omission of the permittee or its employee, agent, or independent contractor from the installation, presence, maintenance, or operation of equipment by permittee or activities of permittee and alleges that the Indemnified Parties are liable, without alleging any independent negligent, or otherwise wrongful, act or omission on the part of the Indemnified Parties or (b) is based on the Indemnified Parties' negligent or otherwise wrongful act or omission in issuing the permit or in failing to properly or adequately inspect or enforce compliance with a term, condition, or purpose of the permit granted to the permittee. Permittee is not required to indemnify the Indemnified Parties for losses or claims occasioned by the negligent or otherwise wrongful act or omission of the Indemnified Parties, except to the extent authorized above regarding the issuance of a permit or the inspection or enforcement of compliance with the permit or when otherwise expressly agreed by permittee; (3) permittee shall adhere to and comply with all provisions of the Terms and Conditions, City Code, and all applicable federal, state, and local rules and regulations, including, but not limited to, Minn. Stat. 237.162 and 237.163; and (4) in the event of a conflict between the Terms and Conditions and City Code, City Code shall govern.
Invoice #5788 (06/22/2023)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 06/22/2023 7:46 AM Obstruction Permit fee per occurance |
$50.00 | x 1 | $50.00 |
Grand Total | |||
Total | $50.00 | ||
Payment 06/22/2023 | $50.00 | ||
Due | $0.00 |
SPECIAL PROVISIONS
Work being proposed is taking place on a roadway (Territorial Road) that will be realigned sometime in the near future. Applicant (Comcast) will be responsible for all costs associated with relocation due to conflicts with the roadway and/or development.
Approvals
Approval | Signature |
---|---|
Applicant | Ben Elsenpeter - 06/22/2023 7:47 AM 43ffeec83dceb7af0d1f5dcec3816fbc 88e902b3a9fa57feb25bbc999976cf85 |
#1 Right of Way Technician Approval | Kelly Matzke - 07/17/2023 11:25 AM 982c5f4d80e528625142a77f8f2f8fb4 4a4e63715d56543bcb6fdf6a4eefb429 |
Internal Notes
Text: | |
File(s): |
Public Notes
Text: | |
File(s): |