Excavation Permit Utility Installation Permit No. 2016-057, UID # 62
App. Status: Closed
Valid: 05/11/2016 - 07/01/2016
City of Maple Grove
Engineering Department
12800 Arbor Lakes Parkway
Maple Grove, MN 55369

Kelly Matzke (612-968-3615)
 

APPLICANT

Applicant:
Name:
Cindy l Albright
Company:
Telcom Construction
Company Phone:Local Phone:
(320558 - 9485
(320558 - 9485
Email Address:
cindy.albright@telcomconstruction.com
Mailing Address:
PO Box 189
Clearwater MN 55320

PROJECT

Nature of Work:
Main Installation
Surface to be disturbed:
Boulevard
Work to start on or after: 05/11/2016
To be completed on or before: 07/01/2016
Applicant Project No.: 16095873

INSTALLATION / CONSTRUCTION

Attach detailed plan sheet:
Size and kind of pipe:
1 strand Fiber
Depth from surface: 36"- 48"
Length of utility construction: 275
Method of installation:
Directional Bore
Open Trench
Machine excavation: Yes
Development: Existing

LOCATION

Location/Address: 17337 66th Place No
Will traffic detouring be necessary? No

Terms

Requirements
  • Contact the Right-of-Way Technician by phone (612-968-3615) 24 hours prior to starting work, and upon completion so a final inspection can be completed in a timely manner.

  • You must adhere to [url=https://www.revisor.mn.gov/statutes/?id=216D]Minnesota Statutes 2015 CHAPTER 216D. EXCAVATION NOTICE SYSTEM[/url]

  • Notify all affected properties in writing prior to beginning work.

  • All cabinets, boxes, pedestals, etc. at corners must meet the City of Maple Grove's City Code, Sec. 360818 traffic visibility at corner lots.

  • All large trucks or large equipment are not allowed on any boulevard sidewalk or bituminous trails unless prior approval has been granted by the Right-of-Technician.

  • All signing for equipment in street must conform to the current MnDOT Manual on Uniform Traffic Control Devices.

  • Pneuma gophering is not allowed by the City of Maple Grove in this area.

  • All underground utilities must be placed a minimum of 36" and 48" maximum below finished top of curb elevation.

  • No hand holes or pot-holing in bituminous trails unless approved by the Right-of-Way Technician.

  • All disturbed areas must be returned to their original conditions within 30 days.

  • Lawn / Blvd areas must be restored per 28-105 of the Maple Grove Code of Ordinances.

  • Must adhere to MnDOT's Standard Specifications for Construction, Section 2575 and Maple Grove's specification for grading, landscaping and traffic control.

  • Notify Right-of Way Technician when work under this permit is completed, not at year's end.

  • Flag or mark utility location as required by state statue prior to calling in locates.

  • No work shall begin this year if it cannot be properly restored this year (unless emergency).

  • Street crossings to be installed perpendicular to street whenever possible.

Invoice #55 (05/09/2016)

Charge Cost Quantity Total
Non-Taxable
added 05/09/2016 2:40 PM

Excavation permit fee per occurance

$130.00 x 1 $130.00
added 05/09/2016 2:40 PM

In addition to excavation permit fee (per lineal foot)

$0.40 x 275 $110.00
Grand Total
Total $240.00
Payment 05/09/2016$240.00
Due$0.00

Approvals

ApprovalSignature
Applicantcindy L. Albright - 05/10/2016 3:32 PM
2c95923da2016128601948754bc3de61
00843a1d458528f3cdeca0d86bcb34d4
#1 Approved ByKelly Matzke - 05/11/2016 3:47 PM
3409460fb278a03b9a6427897c55dbea
a513119d8b7c1618b1f71e9983506a82
Application has been approved. All signatures have been obtained.