City of Maple Grove
Excavation Permit Utility Installation Permit No. 2023-EP026, UID # 5929
App. Status: ApprovedCity of Maple Grove
Engineering Department
12800 Arbor Lakes Parkway
Maple Grove, MN 55369
Kelly Matzke (612-968-3615)
App. Status: ApprovedCity of Maple Grove
Engineering Department
12800 Arbor Lakes Parkway
Maple Grove, MN 55369
Kelly Matzke (612-968-3615)
APPLICANT
Applicant: |
|
CONTRACTOR
Contractor: |
|
PROJECT
Nature of Work: | Main Installation Service Installation |
Surface to be disturbed: | Boulevard |
Work to start on or after: | 03/06/2023 |
To be completed on or before: | 03/06/2024 |
Applicant Project No.: | Comcast JB0001379608 |
INSTALLATION / CONSTRUCTION
Provide a detailed work description: | Comcast Job # JB0001379608 - Underground Fiber Installation: Pulling fiber through existing Comcast conduit, directional boring for placement of new 2" HDPE conduits, installing 5 new fiber vaults. |
Attach detailed plan sheet: | |
Size and kind of pipe: | 2" HDPE - SDR11 |
Depth from surface: | 36"- 48" |
Length of utility construction: | 1341 |
Method of installation: | Directional Bore |
Development: | Existing |
LOCATION
Location/Address: | 9200 Forestview Ln N |
Mark the location of the installation How to use: 1. Use only one option (dot, line, or polygon) 2. Made a mistake? Click on feature and press delete key. |
TRAFFIC CONTROL
Will traffic control be necessary? | Yes |
TRAFFIC CONTROL PLAN
Attach Traffic Control Plan: |
|
Invoice #5427 (02/17/2023)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 02/17/2023 10:54 AM Excavation permit fee per occurance |
$160.00 | x 1 | $160.00 |
added 02/17/2023 10:54 AM In addition to excavation permit fee (per lineal foot) |
$0.40 | x 1,241 | $496.40 |
Grand Total | |||
Total | $656.40 | ||
Payment 02/17/2023 | $656.40 | ||
Due | $0.00 |
SPECIAL PROVISIONS
It is assumed that the proposed work and/or staging area will not impact pedestrian traffic along the existing sidewalks/trails. If the proposed work will do so, a revised traffic control plan will need to be submitted and approved.
Approvals
Approval | Signature |
---|---|
Applicant | Scott T. Sandkamp - 02/17/2023 10:55 AM f9379fe5ac1618725b269bb5ae83404c 43edba3931756e6c7c228eadb558111f |
#1 Right of Way Technician Approval | Kelly Matzke - 03/06/2023 1:38 PM b5f458459d35b783423949458fd8fcb3 34bdab0390eee68f753f8d603eddbee6 |
#2 Traffic Operations Engineer Approval | John Hagen - 03/06/2023 1:38 PM a0fedbc23c3d30286764cc1e8463feb8 b5d5f53f0cf863e39ae1bd7a655939e3 |
Application has been approved. All signatures have been obtained.
Public Notes
Text: | |
File(s): |
Internal Notes
Text: | |
File(s): |