City of Maple Grove
Obstruction Permit Obstruction Permit Permit No. 2022-OP001, UID # 5108
App. Status: ApprovedCity of Maple Grove
Engineering Department
12800 Arbor Lakes Parkway
Maple Grove, MN 55369
Kelly Matzke (612-968-3615)
App. Status: ApprovedCity of Maple Grove
Engineering Department
12800 Arbor Lakes Parkway
Maple Grove, MN 55369
Kelly Matzke (612-968-3615)
APPLICANT
Applicant: |
|
CONTRACTOR
Contractor: |
|
OBSTRUCTION
Reason for obstruction: | Precast Delivery and Setting |
Right-of-Way being obstructed: | Street Sidewalk/Trail |
Attach detailed plan sheet: | |
Obstruction to start on or after: | 03/03/2022 |
Obstruction to be completed on or before: | 09/01/2023 |
Applicant Project No.: | 21-650 |
LOCATION
Location/Address: | 11600 Arbor Lakes Parkway N |
Mark the location of the obstruction: |
TRAFFIC CONTROL
Proposed work that impacts vehicle and/or pedestrian traffic will require a traffic control plan. Will traffic control be necessary? | Yes |
TRAFFIC CONTROL PLAN
Attach Traffic Control Plan: |
Invoice #4590 (03/01/2022)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 03/01/2022 1:23 PM Obstruction Permit fee per occurance |
$50.00 | x 1 | $50.00 |
Grand Total | |||
Total | $50.00 | ||
Payment 03/01/2022 | $50.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | Lindsay K. Strot - 06/13/2022 9:35 AM 92eaae8c2d7c22a5beff25a1aff4b41c dc84dd9edaa67a400ead11727b49815f |
#1 Right of Way Technician Approval | Kelly Matzke - 06/13/2022 1:48 PM 5b211da4d52a8b9562f2bd84f35014e9 61401a702a9bcd184a9e234eb9112578 |
#2 Traffic Operations Engineer Approval | John Hagen - 06/13/2022 1:48 PM 3ab061c4b1b94987e7f4a5768a4a57ff 1db960b57c2968a668b87360ed90e5bf |
Application has been approved. All signatures have been obtained.
Internal Notes
Text: | |
File(s): |
Public Notes
Text: | |
File(s): |