Application Information

Excavation Permit Utility Installation Site Inspection(s) UID # 425
Utility Installation: Permit No. 2016-242
App. Status: In Progress
City of Maple Grove
Engineering Department
12800 Arbor Lakes Parkway
Maple Grove, MN 55369

Kelly Matzke (612-968-3615)
 

Inspection Details

Date: 11/28/2016
Inspection:
Resident wanted assurance that damage done on property will be restored.  Told them probably is on spring repair list due to the timing of the excavation.  
File attachment/photos:
Text:
File(s):
    Powered by