City of Maple Grove
Application Information
Info | Applicant | ||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
|
Excavation Permit Utility Installation Site Inspection(s) UID # 4051
Utility Installation: Permit No. 2020-EP048
App. Status: Inspection CompleteCity of Maple Grove
Engineering Department
12800 Arbor Lakes Parkway
Maple Grove, MN 55369
Kelly Matzke (612-968-3615)
Utility Installation: Permit No. 2020-EP048
App. Status: Inspection CompleteCity of Maple Grove
Engineering Department
12800 Arbor Lakes Parkway
Maple Grove, MN 55369
Kelly Matzke (612-968-3615)
Inspection Details
Public Notes
Text: | |
File(s): |