Excavation Permit Utility Installation UID # 3773
App. Status: Activated
City of Maple Grove
Engineering Department
12800 Arbor Lakes Parkway
Maple Grove, MN 55369

Kelly Matzke (612-968-3615)
 

APPLICANT

Applicant:
Name:
Jamie Goff
Company:
Comcast
Company Phone:Local Phone:
(763258 - 8313
(612518 - 9878
Email Address:
jamie_goff@cable.comcast.com
Mailing Address:
4255 Lexington Ave N
Arden Hills MN 55126

CONTRACTOR

Contractor:
Name:
Kevin Griffin
Company:
D&D
Company Phone:Local Phone:
(763208 - 0195
(763208 - 0195
Email Address:
kgriffin@dd-service.com
Mailing Address:
950 County HWY 10
Spring Lake Park MN 55432

PROJECT

Nature of Work:
Other
Surface to be disturbed:
Turf
Work to start on or after: 04/07/2020
To be completed on or before: 07/31/2020

INSTALLATION / CONSTRUCTION

Provide a detailed work description:
replace 176' in ROW of existing Comcast cable
Attach detailed plan sheet:
Size and kind of pipe:
(1) 1 1/2" HDPE
Depth from surface: 36"- 48"
Length of utility construction in feet: 176
Method of installation:
Note: Beginning July 1, 2025, all installations of underground telecommunications infrastructure must be performed by safety-qualified underground telecommunications installers that meet requirements per MN State Statute 326B.198.
Directional Bore
Development: Existing

LOCATION

Location/Address: 6802 Cotton Wood Ln, maple grove

Invoice #3308 (04/06/2020)

Charge Cost Quantity Total
Grand Total
Total $0.00
Due$0.00

Approvals

ApprovalSignature
Applicant 

Public Notes

Text:
File(s):
    Powered by