Excavation Permit Utility Installation Permit No. 2016-242, UID # 307
App. Status: Closed
Valid: 10/17/2016 - 12/30/2016
City of Maple Grove
Engineering Department
12800 Arbor Lakes Parkway
Maple Grove, MN 55369

Kelly Matzke (612-968-3615)
 

APPLICANT

Applicant:
Name:
Robert L Fenner
Company:
Wright Hennepin Electric
Company Phone:Local Phone:
(763477 - 3088
(612719 - 9811
Email Address:
bfenner@whe.org
Mailing Address:
PO Box 330
Rockford MN 55373

PROJECT

Nature of Work:
Main Installation
Service Installation
Surface to be disturbed:
Boulevard
Work to start on or after: 10/17/2016
To be completed on or before: 12/30/2016
Applicant Project No.: 779981

INSTALLATION / CONSTRUCTION

Attach detailed plan sheet:
Size and kind of pipe:
1/0 15kv primary/350 mcm secondary
Depth from surface: 36"- 48"
Length of utility construction: 450
Method of installation:
Directional Bore
Open Trench
Machine excavation: Yes
Development: New

LOCATION

Location/Address: Killarney Glenn 2nd
Mark the installation/construction
location on the map:
Mark the location of the installation
How to use:
1. Use only one option (dot, line, or polygon)
2. Made a mistake? Click on feature and press delete key.
Will traffic detouring be necessary? No

Terms

Requirements
  • Contact the Right-of-Way Technician by phone (612-968-3615) 24 hours prior to starting work, and upon completion so a final inspection can be completed in a timely manner.

  • You must adhere to [url=https://www.revisor.mn.gov/statutes/?id=216D]Minnesota Statutes 2015 CHAPTER 216D. EXCAVATION NOTICE SYSTEM[/url]

  • Notify all affected properties in writing prior to beginning work.

  • All cabinets, boxes, pedestals, etc. at corners must meet the City of Maple Grove's City Code, Sec. 360818 traffic visibility at corner lots.

  • All large trucks or large equipment are not allowed on any boulevard sidewalk or bituminous trails unless prior approval has been granted by the Right-of-Technician.

  • All signing for equipment in street must conform to the current MnDOT Manual on Uniform Traffic Control Devices.

  • Pneuma gophering is not allowed by the City of Maple Grove in this area.

  • All underground utilities must be placed a minimum of 36" and 48" maximum below finished top of curb elevation.

  • No hand holes or pot-holing in bituminous trails unless approved by the Right-of-Way Technician.

  • All disturbed areas must be returned to their original conditions within 30 days.

  • Lawn / Blvd areas must be restored per 28-105 of the Maple Grove Code of Ordinances.

  • Must adhere to MnDOT's Standard Specifications for Construction, Section 2575 and Maple Grove's specification for grading, landscaping and traffic control.

  • Notify Right-of Way Technician when work under this permit is completed, not at year's end.

  • Flag or mark utility location as required by state statue prior to calling in locates.

  • No work shall begin this year if it cannot be properly restored this year (unless emergency).

  • Street crossings to be installed perpendicular to street whenever possible.

Invoice #234 (10/11/2016)

Charge Cost Quantity Total
Non-Taxable
added 10/11/2016 7:25 AM

Excavation permit fee per occurance

$130.00 x 1 $130.00
added 10/11/2016 7:25 AM

In addition to excavation permit fee (per lineal foot)

$0.20 x 450 $90.00
Grand Total
Total $220.00
Payment 10/11/2016$220.00
Due$0.00

Approvals

ApprovalSignature
ApplicantRobert L. Fenner - 10/11/2016 7:25 AM
2b7b81fbb772971a068c9055e06f16d8
d78dcfe986cd90abb76946e4073dc9fd
#1 Approved ByKelly Matzke - 11/28/2016 7:48 AM
d1add743e368d4ffc8a3228bde4e820e
8f08a027bea6ad2931c897a7268a137d
Application has been approved. All signatures have been obtained.

Public Notes

Text:
11.28.16 Resident that lives at 17847 77th Ave. called to confirm that restoration will be done on property work excavation was done.  Told resident this is probably on spring restoration list with the work taking place this late in the season.  Call Wright Hennepin to confirm.
File(s):

    Internal Notes

    Text:
    File(s):