Excavation Permit Utility Installation Permit No. 2016-189, UID # 295
App. Status: Closed
Valid: 10/06/2016 - 12/31/2016
City of Maple Grove
Engineering Department
12800 Arbor Lakes Parkway
Maple Grove, MN 55369

Kelly Matzke (612-968-3615)
 

APPLICANT

Applicant:
Name:
Jody Cox
Company:
CenterPoint Energy
Company Phone:Local Phone:
(612321 - 5532
(612321 - 5532
Email Address:
jodell.cox@centerpointenergy.com
Mailing Address:
700 W Linden Ave
Minneapolis MN 55440

PROJECT

Nature of Work:
Other
Surface to be disturbed:
Boulevard
Work to start on or after: 10/06/2016
To be completed on or before: 12/31/2016
Applicant Project No.: 79742810

INSTALLATION / CONSTRUCTION

Attach detailed plan sheet:
Size and kind of pipe:
5/8" plastic
MGC# 16-4545
Depth from surface: 36"- 48"
Length of utility construction: 0
Method of installation:
Open Trench
Machine excavation: Yes
Development: Existing

LOCATION

Location/Address: 6300 CYPRESS LN N - MGC# 16-4545
Mark the installation/construction
location on the map:
Mark the location of the installation
How to use:
1. Use only one option (dot, line, or polygon)
2. Made a mistake? Click on feature and press delete key.
Will traffic detouring be necessary? No

Terms

Requirements
  • Contact the Right-of-Way Technician by phone (612-968-3615) 24 hours prior to starting work, and upon completion so a final inspection can be completed in a timely manner.

  • You must adhere to [url=https://www.revisor.mn.gov/statutes/?id=216D]Minnesota Statutes 2015 CHAPTER 216D. EXCAVATION NOTICE SYSTEM[/url]

  • Notify all affected properties in writing prior to beginning work.

  • All cabinets, boxes, pedestals, etc. at corners must meet the City of Maple Grove's City Code, Sec. 360818 traffic visibility at corner lots.

  • All large trucks or large equipment are not allowed on any boulevard sidewalk or bituminous trails unless prior approval has been granted by the Right-of-Technician.

  • All signing for equipment in street must conform to the current MnDOT Manual on Uniform Traffic Control Devices.

  • Pneuma gophering is not allowed by the City of Maple Grove in this area.

  • All underground utilities must be placed a minimum of 36" and 48" maximum below finished top of curb elevation.

  • No hand holes or pot-holing in bituminous trails unless approved by the Right-of-Way Technician.

  • All disturbed areas must be returned to their original conditions within 30 days.

  • Lawn / Blvd areas must be restored per 28-105 of the Maple Grove Code of Ordinances.

  • Must adhere to MnDOT's Standard Specifications for Construction, Section 2575 and Maple Grove's specification for grading, landscaping and traffic control.

  • Notify Right-of Way Technician when work under this permit is completed, not at year's end.

  • Flag or mark utility location as required by state statue prior to calling in locates.

  • No work shall begin this year if it cannot be properly restored this year (unless emergency).

  • Street crossings to be installed perpendicular to street whenever possible.

Invoice #223 (10/05/2016)

Charge Cost Quantity Total
Non-Taxable
added 10/05/2016 2:36 PM

Excavation permit fee per occurance

$130.00 x 1 $130.00
Grand Total
Total $130.00
Payment 10/05/2016$130.00
Due$0.00

Approvals

ApprovalSignature
ApplicantJody Cox - 10/05/2016 2:36 PM
e583544b3c8efae3e725076683ac3409
056ae345f03ee03b61d3918162411870
#1 Approved ByKelly Matzke - 10/07/2016 10:09 AM
581452567ce37424c5ac257523a9a560
5fdfa208ed0c39b9e1c3f91969169cf0
Application has been approved. All signatures have been obtained.

Public Notes

Text:
Please schedule replacement of cement panel immediately after work is done as the City does not allow sidewalks to be left open overnight due to safety concerns for walkers and bikers using the path.  