Excavation Permit Utility Installation Permit No. 2016-120, UID # 173
App. Status: Closed
Valid: 08/22/2016 - 10/17/2016
City of Maple Grove
Engineering Department
12800 Arbor Lakes Parkway
Maple Grove, MN 55369

Kelly Matzke (612-968-3615)
 

APPLICANT

Applicant:
Name:
Cindy Lou Albright
Company:
Telcom Construction
Company Phone:Local Phone:
(320286 - 8369
(286286 - 8369
Email Address:
cindy.albright@telcomconstruction.com
Mailing Address:
PO Box 189
Clearwater MN 55320

PROJECT

Nature of Work:
Main Installation
Service Installation
Surface to be disturbed:
Boulevard
Work to start on or after: 08/22/2016
To be completed on or before: 10/17/2016
Applicant Project No.: 16179518

INSTALLATION / CONSTRUCTION

Attach detailed plan sheet:
Size and kind of pipe:
1 strand fiber
Depth from surface: 36"- 48"
Length of utility construction: 270
Method of installation:
Directional Bore
Open Trench
Machine excavation: Yes
Development: Existing

LOCATION

Location/Address: 10533 Monticello Lane No, Maple Grove
Mark the installation/construction
location on the map:
Mark the location of the installation
How to use:
1. Use only one option (dot, line, or polygon)
2. Made a mistake? Click on feature and press delete key.
Will traffic detouring be necessary? No

Terms

Requirements
  • Contact the Right-of-Way Technician by phone (612-968-3615) 24 hours prior to starting work, and upon completion so a final inspection can be completed in a timely manner.

  • You must adhere to [url=https://www.revisor.mn.gov/statutes/?id=216D]Minnesota Statutes 2015 CHAPTER 216D. EXCAVATION NOTICE SYSTEM[/url]

  • Notify all affected properties in writing prior to beginning work.

  • All cabinets, boxes, pedestals, etc. at corners must meet the City of Maple Grove's City Code, Sec. 360818 traffic visibility at corner lots.

  • All large trucks or large equipment are not allowed on any boulevard sidewalk or bituminous trails unless prior approval has been granted by the Right-of-Technician.

  • All signing for equipment in street must conform to the current MnDOT Manual on Uniform Traffic Control Devices.

  • Pneuma gophering is not allowed by the City of Maple Grove in this area.

  • All underground utilities must be placed a minimum of 36" and 48" maximum below finished top of curb elevation.

  • No hand holes or pot-holing in bituminous trails unless approved by the Right-of-Way Technician.

  • All disturbed areas must be returned to their original conditions within 30 days.

  • Lawn / Blvd areas must be restored per 28-105 of the Maple Grove Code of Ordinances.

  • Must adhere to MnDOT's Standard Specifications for Construction, Section 2575 and Maple Grove's specification for grading, landscaping and traffic control.

  • Notify Right-of Way Technician when work under this permit is completed, not at year's end.

  • Flag or mark utility location as required by state statue prior to calling in locates.

  • No work shall begin this year if it cannot be properly restored this year (unless emergency).

  • Street crossings to be installed perpendicular to street whenever possible.

Invoice #137 (08/15/2016)

Charge Cost Quantity Total
Non-Taxable
added 08/15/2016 11:38 AM

Excavation permit fee per occurance

$130.00 x 1 $130.00
added 08/15/2016 11:38 AM

In addition to excavation permit fee (per lineal foot)

$0.40 x 270 $108.00
Grand Total
Total $238.00
Payment 08/15/2016$238.00
Due$0.00

Approvals

ApprovalSignature
Applicantcindy L. Albright - 08/15/2016 11:38 AM
099a95e2d139d5f7a856622b6fc9cbdb
e396152e4594decb21eee9d15704e11d
#1 Approved ByKelly Matzke - 08/15/2016 1:09 PM
2ea78dad4f1e16b04130e356755969a5
410dac2292b5f7285bcb211675357643
Application has been approved. All signatures have been obtained.

Public Notes

Text:
The neighborhood is almost 40 years old.  The City of Maple Grove requires new pedestals to be placed near existing pedestals whenever possible.  Phone call is still required 24 prior to starting work. 612-968-3615
File(s):

    Internal Notes

    Text:
    File(s):
      Powered by