City of Maple Grove
App. Status: Closed
Valid: 08/11/2016 - 10/01/2016City of Maple Grove
Engineering Department
12800 Arbor Lakes Parkway
Maple Grove, MN 55369
Kelly Matzke (612-968-3615)
APPLICANT
Applicant: |
|
||||||||||||||||||||||||||||||||||||||||
Additional email address to notify: | stephanie.kunkel@telcomconstruction.com |
PROJECT
Nature of Work: | Service Installation |
Surface to be disturbed: | Bituminous Boulevard |
Work to start on or after: | 08/11/2016 |
To be completed on or before: | 10/01/2016 |
Applicant Project No.: | 16158792 |
INSTALLATION / CONSTRUCTION
Attach detailed plan sheet: |
|
Size and kind of pipe: | 3PR, 22G, COPPER WIRE |
Depth from surface: | 36"- 48" |
Length of utility construction: | 600 |
Method of installation: | Directional Bore Other |
If other is selected, please provide additional information: | PLOW |
Machine excavation: | No |
Development: | Existing |
LOCATION
Location/Address: | 11746 65TH pLACE N |
Will traffic detouring be necessary? | No |
Terms
Contact the Right-of-Way Technician by phone (612-968-3615) 24 hours prior to starting work, and upon completion so a final inspection can be completed in a timely manner.
You must adhere to [url=https://www.revisor.mn.gov/statutes/?id=216D]Minnesota Statutes 2015 CHAPTER 216D. EXCAVATION NOTICE SYSTEM[/url]
Notify all affected properties in writing prior to beginning work.
All cabinets, boxes, pedestals, etc. at corners must meet the City of Maple Grove's City Code, Sec. 360818 traffic visibility at corner lots.
All large trucks or large equipment are not allowed on any boulevard sidewalk or bituminous trails unless prior approval has been granted by the Right-of-Technician.
All signing for equipment in street must conform to the current MnDOT Manual on Uniform Traffic Control Devices.
Pneuma gophering is not allowed by the City of Maple Grove in this area.
All underground utilities must be placed a minimum of 36" and 48" maximum below finished top of curb elevation.
No hand holes or pot-holing in bituminous trails unless approved by the Right-of-Way Technician.
All disturbed areas must be returned to their original conditions within 30 days.
Lawn / Blvd areas must be restored per 28-105 of the Maple Grove Code of Ordinances.
Must adhere to MnDOT's Standard Specifications for Construction, Section 2575 and Maple Grove's specification for grading, landscaping and traffic control.
Notify Right-of Way Technician when work under this permit is completed, not at year's end.
Flag or mark utility location as required by state statue prior to calling in locates.
No work shall begin this year if it cannot be properly restored this year (unless emergency).
Street crossings to be installed perpendicular to street whenever possible.
Invoice #131 (08/10/2016)
Charge | Cost | Quantity | Total |
---|---|---|---|
added 08/10/2016 2:46 PM Excavation permit fee per occurance |
$130.00 | x 1 | $130.00 |
added 08/10/2016 2:46 PM In addition to excavation permit fee (per lineal foot) |
$0.40 | x 600 | $240.00 |
Grand Total | |||
Total | $370.00 | ||
Payment 08/10/2016 | $370.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | Steph Kunkel - 08/10/2016 2:46 PM 19790ff30c240d30bf6fc7b47daf0eea 9a96a6f13f4560adaf1084f80b481e2b |
#1 Approved By | Kelly Matzke - 08/15/2016 10:32 AM c21b108d4d0901343f28d51dfee2e05c 2a4604e593480db2c46dcea0229edf6c |
Public Notes
Text: | |
File(s): |
Internal Notes
Text: | |
File(s): |