App. Status: Approved
Valid: 05/06/2018 - 07/27/2018City of Maple Grove
Engineering Department
12800 Arbor Lakes Parkway
Maple Grove, MN 55369
Kelly Matzke (612-968-3615)
APPLICANT
Applicant: |
|
||||||||||||||||||||||||||||||||||||||||
Additional email address to notify: | becky.richter@centurylink.com |
PROJECT
Nature of Work: | Other |
Surface to be disturbed: | Bituminous Boulevard |
Work to start on or after: | 05/06/2018 |
To be completed on or before: | 07/27/2018 |
Applicant Project No.: | 12734ECB |
INSTALLATION / CONSTRUCTION
Provide a detailed work description: | There is a proposed Bank of America building going up at 12734 Elm Creek Blvd. We have 3-4" PVC conduits with a fiber cable on their property. We will have to move our facilities off the private property into the existing utility easement. |
Attach detailed plan sheet: | |
Size and kind of pipe: | 4" PVC conduits |
Depth from surface: | 36"- 48" |
Length of utility construction: | 120 |
Method of installation: | Hand Dig Open Trench Other |
If other is selected, please provide additional information: | We will be working with Diversified Construction to thaw the area to move our facilities. |
Machine excavation: | Yes |
Development: | Existing |
LOCATION
Location/Address: | 12734 Elm Creek Blvd |
Mark the installation/construction location on the map: |
|
Mark the location of the installation How to use: 1. Use only one option (dot, line, or polygon) 2. Made a mistake? Click on feature and press delete key. |
|
Will traffic control be necessary? | No |
Will any excavation be taking place on Hennepin County right-of-way? | Yes |
EXCAVATION LOCATION
How much work is going to be performed in right of way? | All in Hennepin County |
Terms
Contact Kelly Matzke at (612) 968-3615 at least 24 hours prior to construction to activate permit. Failure to contact Mr. Matzke to activate permit prior to work being started shall be considered a violation of the permit and grounds for dismissing contractor from the job site.
Article IV. [url=https://www.municode.com/library/mn/maple_grove/codes/code_of_ordinances?nodeId=COOR_CH28STSIOTPUPL_ARTIVPURI-WMA]Public Right-of-Way Management Ordinance[/url] will be enforced for work being done in the right-of-way.
All excavations taking place in right-of-way must conform to [url=https://www.revisor.mn.gov/statutes/?id=216D]Minnesota Statute Chapter 216D. Excavation Notice System[/url].
All rules and regulations for locates must conform to the most current [url=http://www.gopherstateonecall.org/images/GSOCHandbookOnlineVersion.compressed.pdf]Gopher State One Handbook[/url].
Flagging or painting of route required by City of Maple Grove prior to calling in Gopher State One Call ticket.
All properties affected by excavation and construction must be notified in writing prior to beginning work.
It is recommended that jobs that consist of more than 1000 feet in length set up meets with locators.
A City of Maple Grove right-of-way approved permit shall be on site at all times and available upon request by any City official.
Safety vests must be worn by all people occupying the right-of-way.
Work being done on Hennepin County right-of-way requires notification permit with City of Maple Grove and a Hennepin County right-of-way permit.
All underground utilities must be placed a minimum of 36” and 48” maximum below finished top of curb elevation.
Vehicles, equipment, and materials are not allowed on any sidewalk or trail unless prior approval has been granted by a City of Maple Grove official.
Notify Kelly Matzke at 612-968-3615 of any changes or revisions made to right-of-way permits that have already been approved by the City of Maple Grove.
Street crossings must be installed perpendicular to the road to avoid future potholing in street.
Plowing and pneuma gophering are not acceptable forms of excavation allowed in the City of Maple Grove.
Core drilling in street or trail requires approval prior to doing work.
All open trenches and holes must be backfilled before leaving work site at the end of the day.
All flags from locates must be removed and picked up immediately once excavation has been completed.
All permit applications requiring traffic control shall conform to the most recent version of the Minnesota Manual on Uniform Traffic Control Devices [url=http://www.dot.state.mn.us/trafficeng/publ/mutcd/index.html] Minnesota Manual on Uniform Traffic Control Devices[/url], including the Temporary Traffic Control Zone Layouts Field Manual [url=https://www.dot.state.mn.us/trafficeng/publ/fieldmanual/fieldmanual.pdf] Temporary Traffic Control Zone Layouts Field Manual[/url], and be approved by the Transporation Operations Engineer.
The City of Maple Grove only allows traffic control to occur during off peak hours, which is between 9:00am-3:00 pm Monday thru Friday.
Traffic control on weekends requires prior approval from Transportation Operations Engineer John Hagen. John can be reached via email at [url=mailto:jhagen@maplegrovemn.gov]jhagen@maplegrovemn.gov[/url] or 763-494-6364
Restoration must conform to [url=https://library.municode.com/mn/maple_grove/codes/code_of_ordinances?nodeId=COOR_CH28STSIOTPUPL_ARTIVPURI-WMA_S28-105RERI-W]Section 28-105. Restoration of Right-of-Way [/url].
All disturbed areas during excavation must be restored to their original condition within 30 days.
Damage on boulevards due to vehicles and equipment must be restored and treated the same way that excavation damage is restored.
Work completed in winter months must notify City with plans for restoration to take place in the spring.
Once restoration has been completed, contact Kelly Matzke at (612) 968-3615 or change status on permit software so an inspection can be completed in a timely manner. Failure to notify the City will result in all permits with the City of Maple Grove being put on hold until notification takes place.
All contractors, including subcontractors, must be registered with the City of Maple Grove to do work in the right-of-way. Contractors doing work in the right-of-way that are not registered with the City will be considered in violation, and will be dismissed from the work site until registration is completed.
Absolutely no removal of bituminous or cement is allowed during winter working months without approval.
Since all or partial work will be completed in the Hennepin County Right of Way, you are also required to submit an application to [url=https://roadpermits.co.hennepin.mn.us/]Hennepin County[/url].
Invoice #1227 (02/28/2018)
Charge | Cost | Quantity | Total |
---|---|---|---|
Grand Total | |||
Total | $0.00 | ||
Due | $0.00 |
Approvals
Approval | Signature |
---|---|
Applicant | Becky Richter - 02/28/2018 7:45 AM 2705f4e898597801a3f2843d43c9a8cc f5a54aa06d71698930c8b222a14b7814 |
#1 Approved By | Kelly Matzke - 02/28/2018 2:29 PM d63f62373eec73bb25934624fd16b7e6 c19a553a5bc8effa37d28191ff12d714 |
Public Notes
Text: | |
File(s): |