City of Maple Grove
Application Information
Info | Applicant | ||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
|
Excavation Permit Utility Installation Site Inspection(s) UID # 109
Utility Installation: Permit No. 2016-059
App. Status: Inspection CompleteCity of Maple Grove
Engineering Department
12800 Arbor Lakes Parkway
Maple Grove, MN 55369
Kelly Matzke (612-968-3615)
Utility Installation: Permit No. 2016-059
App. Status: Inspection CompleteCity of Maple Grove
Engineering Department
12800 Arbor Lakes Parkway
Maple Grove, MN 55369
Kelly Matzke (612-968-3615)
Inspection Details
Date: | 07/01/2016 |
Inspection: | Restoration completed with black dirt and seed |
File attachment/photos: |
|
Text: | |
File(s): |