City of Maple Grove
Application Information
Info | Applicant | ||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
|
Excavation Permit Utility Installation Site Inspection(s) UID # 1047
Utility Installation: Permit No. 2017-061
App. Status: In ProgressCity of Maple Grove
Engineering Department
12800 Arbor Lakes Parkway
Maple Grove, MN 55369
Kelly Matzke (612-968-3615)
Utility Installation: Permit No. 2017-061
App. Status: In ProgressCity of Maple Grove
Engineering Department
12800 Arbor Lakes Parkway
Maple Grove, MN 55369
Kelly Matzke (612-968-3615)
Inspection Details
Date: | |
Inspection: | 5.9.17 Resident called to report damage done to concrete on corner of 68th and Vagabond. |
File attachment/photos: |
|
Public Notes
Text: | |
File(s): |