City of Maple Grove
Right-of-Way Registration
Each person who occupies, uses, or seeks to occupy or use the right-of-way or any equipment located in the right-of-way, including by lease, sublease or assignment, or who has, or seeks to have, equipment located in any right-of-way must register with the city. Please contact Rhonda McMullen at rmcmullen@maplegrovemn.gov to obtain instructions to complete registration. Registration must be completed before permit applications will be reviewed or work can be performed in the right-of-way.
- Go to Applications List
- ROW Registration
Start New | Renew ExistingRegistration for ROW Permit
- ROW Registration
Excavation Permit
Excavation Permit: An Excavation Permit is required by a registrant to excavate that part of the right-of-way described in such permit and to hinder free and open passage over the specified portion of the right-of-way by placing facilities described therein, to the extend and for the duration specified therein.
- Go to Applications List
- Utility Installation
Start NewApplication to install utilities
- Utility Installation
Obstruction Permit
Obstruction Permit: An Obstruction Permit is required by a registrant to hinder free and open passage over the specified portion of right-of-way by placing equipment described therein on the right-of-way, to the extent and for the duration specified therein. An Obstruction Permit is not required if a person already possesses a valid Excavation Permit for the same project.
- Go to Applications List
- Obstruction Permit
Start NewApplication to obstruct right-of-way
- Obstruction Permit
Small Wireless Facility Permit
Small Wireless Facility Permit: A Small Wireless Facility Permit is required by a registrant to erect or install a wireless support structure, to collocate a small wireless facility, or to otherwise install a small wireless facility in the specified portion of the right-of-way, to the extent specified therein, provided that such permit shall remain in effect for the length of time the facility is in use, unless lawfully revoked.
- Go to Applications List
- Small Wireless Facility Permit
Start NewApplication to install small wireless facilities
- Small Wireless Facility Permit
Daily Overweight Permit
Allowed weights and/or time variances will be established by the Maple Grove Streets Department and may fluctuate with weather and road conditions. Additional information and updates available at MnDOT under Seasonal Load Limits.
SIGN UP for an account in the upper right hand corner.
- Go to Applications List
- Daily Overweight Load
Start NewDaily Overweight Load Permit Request
- Daily Overweight Load